Heron’s Peelwood Project - EM Drill Targets Identified
Sydney, Australia, April 23, 2018 (GLOBE NEWSWIRE) -- Heron Resources Ltd. (ASX:HRR, “Heron” or the “Company”) is pleased to report that a number of drill ready EM anomalies have been identified at its wholly owned Peelwood base metal project located 105 km north of the Company’s Woodlawn Zinc-Copper Project in New South Wales, Australia.
- Review of Airborne Electromagnetic (AEM) data from 2014 resulted in several bedrock conductors being modelled
- At the historic Cordillera Mine prospect:
- AEM conductors identified at-depth along strike from the old workings
- Grab samples from the prospect contain 16% Zn, 25% Pb and 497g/t Ag
- Planning underway to drill these conductors targeting high-grade VMS style base metal mineralisation
- AEM conductors at the John Fardy and Peelwood mines are being assessed as potential additional drill targets
Commenting on the targets Heron’s Managing Director, Mr Wayne Taylor said: “The AEM targets at Peelwood are an exciting kick start to exploration in this area. Our geophysical consultant is an expert at modelling such data and believes there are a number of untested, standout anomalies that warrant further testing within this VMS camp. The high-grade nature of the VMS mineralisation at Cordillera, as confirmed by the recent grab samples, is encouraging and we are looking forward to getting a first phase of drilling into these anomalies as soon as possible. We are currently working through the standard procedural process to progress the on-ground assessment of these targets.”
Peelwood Project Background
The Peelwood Project is located 165km west of Sydney, and 105 km north from the Company’s Woodlawn Zinc-Copper Project in New South Wales, Australia (Figure 1). Peelwood lies within undulating, mostly forested country, 800m above sea level, and is underlain by Silurian aged shales and other fine grained sedimentary rocks of the Cuddyong Formation and the felsic Kangaloolah Volcanics. VMS style deposits were first mined here in 1880’s with key centres occurring on the tenements newly pegged by Heron, namely the Peelwood, John Fardy and Cordillera deposits (Figure 2). Each of these historical deposits include a number of massive sulphide lenses located at, or adjacent to, the sheared contact between the Cuddyong Formation and the Kangaloolah Volcanics.
Cordillera Prospect
The Cordillera Prospect is centered on the historic Cordillera mine located 4km north-west of Peelwood (Figure 2). The mine was opened in 1883 and production peaked in 1888 with 9,000 t of ore being treated that year producing copper, lead, silver and gold from oxidised ore down to a depth of 60m. Underground production continued until 1889 and the dumps were reworked in 1928. The mineralisation is considered to be of a volcanogenic massive sulphide (VMS) type consisting of lenses contained within shales close to the steeply (75-85o) dipping structural contact with the overlying coarse grained felsic volcanics (Figure 3).
Evidence of the historical mining activity is still present at the site. The Cordillera Mine and other mines in the district were generally worked to a depth where fresh sulphides were encountered. A recent grab sample of such massive base metal sulphides from the Cordillera dumps returned assays of 16% Zn, 25% Pb and 497g/t Ag providing support for the presence of high-grade mineralisation. The mined lode at Cordillera was reported as being 1.2m wide and 107m in strike. However, DDH coring in 1971 by A1 Consolidated Gold Pty Ltd1 intercepted 2.2g/t Au, 11.6g/t Ag, 0.78% Zn. 0.1% Cu and 0.44% Pb over 17m from 111.6m downhole depth. A core intercept to the south returned a similar broad zone 24m wide with a better portion of 2.9g/t Au, 10.2g/t Ag, 0.3% Zn, 0.24% Cu and 0.83% Pb over 2.7m from 89m downhole depth. The intercepts indicate a broad zone of alteration associated with the mineralisation at Cordillera.
A 2014 AEM survey undertaken by previous owners has been reviewed by Heron’s geophysical consultant who has identified several bedrock conductors potentially related to mineralisation. In particular, these AEM conductors (Figure 3) occur along the line of the historically mined mineralisation and have not been tested at depth.
The conductors North of the old mine are modelled starting at some 50m below the surface in an area of known workings (shafts and costeans) with moderate pyrite alteration seen in the surface felsic volcanic and shale rocks (Figure 3 and 4). A program of drilling is being planned to test these conductors. Land owner and statutory approvals are currently being sought with no issues being identified to date.
A number of additional modelled AEM anomalies at the John Fardy prospect are also being assessed and may provide further drill targets as part of this program. Subject to suitable drill rig availability, the Company is targeting to drill a number of these targets before the end of financial year.
Figure 1: Peelwood Project Location Diagram
http://www.heronresources.com/tsximages/20180423/230418_fig1.jpg
Figure 2: Geological Map of the Peelwood area showing the location of the key EM anomalies
http://www.heronresources.com/tsximages/20180423/230418_fig2.jpg
Figure 3: Cordillera Prospect detail - showing location of electromagnetic anomalies in relation to the geology and previous mine workings. The VMS mineralisation occurs close to the structural contact between the felsic volcanics and shales units. Refer to legend in Figure 2.
http://www.heronresources.com/tsximages/20180423/230418_fig3.jpg
Figure 4: Cordillera Prospect Long Section looking east showing position of modeled AEM plate and how historical drilling failed to test the target. Pierce-point for the proposed hole shown as red dot. Refer to legend in Figure 2.
http://www.heronresources.com/tsximages/20180423/230418_fig4.jpg
About Heron Resources Limited:
Heron’s primary focus is the development of its 100% owned, high grade Woodlawn Zinc-Copper Project located 250km southwest of Sydney, New South Wales, Australia.
Compliance Statement (JORC 2012 and NI43-101)
The technical information in this report relating to the exploration results is based on information compiled by Mr. David von Perger, who is a Member of the Australian Institute of Mining and Metallurgy (Chartered Professional – Geology). Mr. von Perger is a full time employee of Heron Resources Ltd. and has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the “Australasian Code for Reporting of Exploration Results and “qualified person” as this term is defined in Canadian National Instrument 43-101 (“NI 43-101”). Mr. von Perger has approved the scientific and technical disclosure in the news release.
Zinc equivalent calculation
The zinc equivalent ZnEq calculation takes into account, mining costs, milling costs, recoveries, payability (including transport and refining charges) and metal prices in generating a Zinc equivalent value for Au, Ag, Cu, Pb and Zn. ZnEq = Zn%+Cu%*3.12+Pb%*0.81+*Au g/t*0.86+Ag g/t*0.03. Metal prices used in the calculation are: Zn US$2,300/t, Pb US$ 2,050/t, Cu US$6,600/t, Au US$1,250/oz and Ag US$18/oz. It is Heron’s view that all the metals within this formula are expected to be recovered and sold. Metallurgical metal recoveries used for the formula are 88% Zn, 70% Pb, 70% Cu, 33% Au and 82% Ag; these are based on historical recoveries at Woodlawn and supported by metallurgical test work undertaken during the 2015-16 feasibility study.
JORC 2012 Table 1 (Peelwood Project)
Section 1 Sampling Techniques and Data
(Criteria in this section applies to all succeeding sections)
Criteria | JORC Code explanation | |
Sampling techniques |
|
|
Drilling techniques |
|
|
Drill sample recovery |
|
|
Logging |
|
|
Sub-sampling techniques and sample preparation |
|
|
Quality of assay data and laboratory tests |
|
|
Verification of sampling and assaying |
|
|
Location of data points |
|
|
Data spacing and distribution |
|
|
Orientation of data in relation to geological structure |
|
|
Sample security |
|
|
Audits or reviews |
|
|
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria | JORC Code explanation | |
Mineral tenement and land tenure status |
|
|
Exploration done by other parties |
|
|
Geology |
|
|
Drill hole Information |
|
|
Data aggregation methods |
|
|
Relationship between mineralization widths and intercept lengths |
|
|
Diagrams |
|
|
Balanced reporting |
|
|
Other substantive exploration data |
|
|
Further work |
|
|
1 Bratt, B.T. 1998 Annual exploration report for EL 2934 (GS 1998-301)
For further information, please visit www.heronresources.com.au or contact:
Australia:
Mr Wayne Taylor
Managing Director and Chief Executive Officer
Tel: +61 2 9119 8111 or +61 8 6500 9200
Email: heron@heronresources.com.au
Jon Snowball
FTI Consulting
+61 2 8298 6100
jon.snowball@fticonsulting.com
Canada:
Tel: +1 647-862-1157 (Toronto)