M2 Cobalt Discovers New Anomalies with Showings of 37.8 % Cu and 18.15 G/t Au Within Its New Kilembe-Area Exploration Licences
Vancouver, May 23, 2019 - M2 Cobalt Corp. (TSXV: MC) (OTCQB: MCCBF) (FSE: A0K) (the "Company") is pleased to provide an update on its 2019 exploration program launched in March 2019. In addition to conducting further infill sampling around its Waragi and Nile targets, ground geophysics and geochemistry have commenced across the new exploration licenses acquired in October 2018 at Bujagali and in the Kilembe area.
To-date in 2019, 509 rock and 3,153 soil samples have been collected within the new and existing licences. Sample results have now been received for 463 rock and 3,010 soil samples.
Of the rock grab samples collected within the new Kilembe-area licenses, 114 results have been received. Two localized, surficial copper-gold showings were discovered (named Eagle and Senator). At Eagle, 2 rock grab samples contain 18.15 grams per tonne gold ("g/t Au") and 37.8 percent copper ("%Cu") and 6.85 g/t Au and 24.6 %Cu, respectively. At Senator, 12 rock grab samples contain from 0.12 %Cu to 7.8 %Cu and 24 samples contain from 0.2 to 16.3 g/t Au (including 10 samples with more than 5.03 g/t Au and 4 samples with more than 10.45 g/t Au).
In addition to the rock grab samples, a 25m by 25m spaced soil grid was completed at the Senator target. From the 133 soil samples collected, a coincidental gold and copper-in-soil anomaly was identified. Soil samples contain from 30 parts per million copper ("ppm Cu") to 554 ppm Cu and from 0.011 g/t Au to 1.06 g/t Au and follow a NE-SW trend. The anomaly remains open in both directions.
Of the rock grab sample results received from Bujagali, 88 samples contain results from 0.1 percent cobalt ("%Co") to 2.5 %Co and 71 samples contain from 0.1 %Cu to 1.82 %Cu. As well, 9 samples contain from 0.43 to 1.64 grams per tonne gold ("g/t Au"). All of the rock grab samples are coincident with the Company's Katanga-Style geochemical anomalies. A map setting out further details of these results is available on the Company’s web site (www.m2cobalt.com/projects/bujagali).
Rock grab samples are by their nature selective and are not necessarily indicative of the general geology or grade within the property.
The Company has also commenced drilling at its Bujagali properties. This drill program is an integral piece of the Company's 2019 exploration program announced on March 14, 2019. The drill program is being funded under the US$3 million working capital facility provided by Jervois Mining Ltd. ("Jervois") as part of the friendly "at market" merger currently being completed by the two companies.
The Company has signed a drill contract with ADT Africa for the drill program and crews and support staff have been mobilized to the Company's Waragai and Bombo targets at the Bujagali Property. The drill program will systematically test the large regional copper-cobalt geochemical anomaly and the ultramafic bodies discovered during the Company's 2018 work program and further expanded during the 2019 work program.
The Company continues to collect high resolution ground magnetics and induced polarization geophysics ("IP") and to conduct mapping along the Waragi trend. This, combined with geochemical results from 2018 and the recent sampling results set out above, has been used to delineate the placement of specific drill collars.
Induced Polarization geophysics ("IP") is now complete at Bombo. This, combined with geochemical results from 2018, has been used to delineate the placement of specific drill collars.
Simon Clarke, CEO, stated, "We are continuing to build on and delineate our Katanga-Style regional cobalt-copper targets and are very pleased with the large scale of the regional play that is emerging. We are excited to have mobilized drill rigs onto two key cobalt-copper targets as well as our nickel-copper-cobalt targets at Bombo."
"We are also very pleased with initial exploration results from our new Kilembe-area licenses and, in particular, the high grades of the sampling conducted to-date. These new licenses expand our foot-print around the historic Kilembe mine which produced significant amounts of copper and cobalt whilst in operation."
Quality Assurance
All rock and soil samples are sent to ALS Chemex South Africa (Pty) Ltd., an independent and fully accredited laboratory in South Africa for analysis for gold multi-element Induction Coupled Plasma Spectroscopy. M2 Cobalt Corp. also has a regimented Quality Assurance, Quality Control program where at least 10% duplicates and blanks are inserted into each sample shipment.
About M2Cobalt
M2 Cobalt Corp. is focused on discovering and developing world-class cobalt assets (and related minerals) to help address the growing deficit in the supply of cobalt. The Company has a large, highly prospective land package in the Republic of Uganda, East Africa bordering historic production and on the same mineral trends as some of the major mines in the neighboring DRC where over 60% of world cobalt supply originates. Uganda is a stable country with a growing economy looking to re-energize its historic mining industry. The Company has a highly experienced management team and board of directors, which has been involved in funding and advancing resource projects globally. Further information on the Company and its projects can be found at www.m2cobalt.com
The technical content of this news release has been reviewed and approved by Dean Besserer, P.Geol., the Technical Advisor of the Company and a Qualified Person as defined by National Instrument 43-101.
For further information, contact Simon Clarke at sclarke@m2cobalt.com or Andy Edelmeier at andy@m2cobalt.com
On behalf of the Board, M2 COBALT CORP.
Simon Clarke
Chief Executive Officer
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This news release may contain certain "Forward-Looking Statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When used in this news release, the words "anticipate", "believe", "estimate", "expect", "target, "plan", "forecast", "may", "schedule" and other similar words or expressions identify forward-looking statements or information. These forward-looking statements or information may relate to exploration work to be undertaken in Uganda, the reliability of third party information, and certain other factors or information. Such statements represent the Company's current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social risks, contingencies and uncertainties. Many factors, both known and unknown, could cause results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements. The Company does not intend, and does not assume any obligation, to update these forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any other events affections such statements and information other than as required by applicable laws, rules and regulations.