Suche
 
Folgen Sie uns auf:

Telson Mining Corp. Provides Update on Filing 2019 Audited and Q1 2020 Financial Statements

29.07.2020  |  The Newswire
Vancouver, July 29, 2020 - Telson Mining Corp. ("Telson" or the "Company" (TSX Venture Exchange-TSN, OTC Pink-SOHFF, Frankfurt-TSGN (formerly SQ82)) (TSXV:TSN) (OTC:SOHFF) is pleased to update shareholders on the filing of its audited financial statements, management discussion and analysis and related certifications in respect of its financial year ended December 31, 2019 today its Q1 financials for the period ended March 31, 2020. As disclosed in previous news releases, COVID-19 related issues within Mexico caused delays in access to the Company's mine sites and slowed the flow of information required for the auditors to complete their reports. Currently, Telson expects to file the required annual and Q1 financials and MD&A by the July 30, 2020 deadline.

The Company would like to thank our shareholders for their continued patience as we worked with our auditors through this difficult time.

About Telson Mining Corporation

Telson Mining Corp. is a Canadian based mining company with two 100% owned Mexican gold, silver, and base metal mining projects.

Telson's Tahuehueto mining project, located in north-western Durango State, Mexico where construction has been advanced to an estimated 60-70% of completion, is waiting for final funding to finish construction of the processing plant and related assets to produce gold, silver, lead and zinc in concentrates within its own on-site mineral processing facility, with a designed capacity of at least 1,000 tonnes per day. The Company is targeting completion of construction during 2021, six to eight months after securing final funding.

Campo Morado is a polymetallic base metal mine with mining and milling equipment capable of producing up to 2,500 tonnes per day. Four months after purchasing Campo Morado, Telson brought the mine back into operation initiating preproduction in October 2017 and declared commercial production in May 2018, operating the mine continuously for 22 months until August 2019 when the project was put on care and maintenance. Telson brought the mine out of care and maintenance and reinitiated mining and milling operations during late January 2020, temporarily suspended operations during April and May 2020 as mandated by the Mexican Government for COVID-19 precautions, and re-initiated mining operations June 4, 2020 after mining was declared an essential service within Mexico.

Visit: www.telsonmining.com

On Behalf of the Board of Directors

(signed) "Ralph Shearing"

Ralph Shearing, President, CEO and Director

Cautionary Note Regarding Production Decisions and Forward-Looking Statements

It should be noted that Telson declared commercial production at Campo Morado prior to completing a feasibility study of mineral reserves demonstrating economic and technical viability. Accordingly, readers should be cautioned that Telson's production decision has been made without a comprehensive feasibility study of established reserves such that there is greater risk and uncertainty as to future economic results from the Campo Morado mine and a higher technical risk of failure than would be the case if a feasibility study was completed and relied upon to make a production decision. Telson has completed a preliminary economic assessment ("PEA") mining study on the Campo Morado mine that provides a conceptual life of mine plan and a preliminary economic analysis based on the previously identified mineral resources (see News Release dated November 8, 2017 and April 4,2018).

Statements contained in this news release that are not historical facts are "forward-looking information" or "forward-looking statements" (collectively, "Forward-Looking Information") within the meaning of applicable Canadian securities laws. Forward Looking Information includes, but is not limited to, disclosure regarding the planned recommencement of mining operations at Campo Morado; and other possible events, conditions or financial performance that are based on assumptions about future economic conditions and courses of action; the timing and costs of future activities on the Company's properties, such as production rates and increases; success of exploration, development and bulk sample processing activities, and timing for processing at its own mineral processing facility on the Tahuehueto project site. In certain cases, Forward-Looking Information can be identified by the use of words and phrases such as "plans", "expects", "scheduled", "estimates", "forecasts", "intends", "anticipates" or variations of such words and phrases. In preparing the Forward-Looking Information in this news release, the Company has applied several material assumptions, including, but not limited to, that the current exploration, development, environmental and other objectives concerning the Campo Morado Mine and the Tahuehueto Project can be achieved; that recommencement of operations at Campo Morado will proceed as planned; the continuity of the price of gold and other metals, economic and political conditions and operations. Forward-Looking Information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the Forward-Looking Information. There can be no assurance that Forward-Looking Information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on Forward-Looking Information. Except as required by law, the Company does not assume any obligation to release publicly any revisions to Forward-Looking Information contained in this news release to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information about Telson Mining Corporation, please contact:

Glen Sandwell
Corporate Communications Manager
ir@telsonmining.com
Tel: +1 (604) 684-8071

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Luca Mining Corp.
Bergbau
A3D74X
CA54929M1068
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"