Suche
 
Folgen Sie uns auf:

Golden Minerals Drills 23.4m Grading 5.96 g/t Au at Rodeo Gold Project, Durango, Mexico

11.08.2020  |  GlobeNewswire

GOLDEN, Aug. 11, 2020 - Golden Minerals Company (“Golden Minerals”, “Golden” or the “Company”) (NYSE American and TSX: AUMN) today announced it has received positive assay results from the first nine diamond drill holes of its in-fill resource definition drill program at the Rodeo gold-silver project located in Durango State, Mexico.

Each of the first nine diamond drill holes intersected wide zones of near-surface gold mineralization. Drill hole depths averaged 50 meters and were drilled at a 60-degree angle to the southeast. Mineralized material consists of highly silicified epithermal veins and breccias hosted in felsic volcanic rocks. Significant results are summarized in the table below, and complete results are available on the Company website. [link]

Drill Hole ID From (m) To (m) Interval (meters) Au (g/t) Ag (g/t)
RDO_20_001_M* 0 45 45 1.85 10.7
including 7.31 36.8 29.44 2.59 13.4
including 19.15 32.4 13.23 4.04 19.9
RDO_20_002 0 35 35 2.18 7.3
including 9.6 19.5 9.9 4.21 5
including 24.61 35 10.39 2.44 17.2
RDO_20_003_M* 0 40 40 3.23 10.8
including 9.15 22.1 12.95 6.86 15.8
including 28.1 39 10.85 2.62 14.9
RDO_20_004 0 50 50 1.27 8.2
including 12 21.2 9.18 3.33 2.7
RDO_20_005_M* 0 40 40 3.78 17.8
including 3.9 27.3 23.4 5.96 19.8
RDO_20_006 0 30 30 3.06 9.1
including 3 18.5 15.5 5.21 10.4
including 3 11.1 8.11 7.55 11.1
RDO_20_007 0 50 50 0.76 3
including 18.7 25.9 7.2 3.36 6.9
RDO_20_008 0 40 40 2.95 10.4
including 7.9 28.4 20.5 5.13 15.2
including 15.4 25 9.6 7.23 23.6
RDO_20_009 0 45 45 1.51 5.6
including 7.75 28 20.25 2.67 5.5
including 14.75 28 13.25 3.32 7.1

Note: Intervals in the table represent drilled length. It is expected that true thickness is approximately 80% of drilled length as drill holes were drilled perpendicular to the gold mineralization that dips at approximately 25 degrees to the northeast.

* Drill holes 001M, 003M and 005M were drilled with PQ drill-core to collect samples for metallurgical test work. Remaining drill holes were drilled with HQ drill-core.

The objectives of the drill program are to provide greater detail on the gold mineralization at Rodeo by infill drilling and to provide additional material for metallurgical and geotechnical test work. Confirmation of continuity of the gold grades in the heart of the deposit is an important step towards the future development of the Rodeo project outlined in the recent Preliminary Economic Assessment published on May 28, 2020 (link).

Warren Rehn, President and Chief Executive Officer of Golden Minerals, commented, "We are pleased with the initial drill results as they confirm the previously reported grades and modeled continuity of the deposit. We are particularly excited about drill hole 002, as this appears to indicate that there is good opportunity to expand the high-grade mineralization to the southwest, further supporting the potential development of the project.”

Rodeo Drill Hole Locations is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/99bf9361-6a96-4d1b-b051-a79c5d023e8b

About Rodeo
Rodeo is an 1,866-hectare gold project located in Durango State, Mexico approximately 80 kilometers west of the Company's Velarde?a Properties and processing mills. Golden acquired the Rodeo property subject to a royalty interest due to La Cuesta International in the second quarter 2015, prior to which exploration by other companies identified a gold-bearing system exposed at surface. Golden conducted a 2,080-meter core drilling program in 2016 and outlined a potentially open pit minable, high-grade resource as reported in a NI 43-101 Technical Report dated January 26, 2017:

Classification Cut-off Tonnes (Mt) Au g/t Ag g/t Au (Koz) Ag (Koz)
Indicated 0.83 0.4 3.3 11 46 200

Notes:

(1) Cut-off grade and Au equivalent calculated using metal prices of $1,220 and $17 per troy ounce of Au and Ag, recoveries of 77% and 90% Au and Ag;
(2) Mineral resources have been pit-shell constrained using the Lerch Grossman algorithm with cost inputs per tonne of $7.50 mining, $10 trucking and $20 processing. A breakeven cut-off including trucking and processing costs per block was applied to a block model within the optimized shell;
(3) Metal prices do not exceed three-year trailing average as of the end of December 2016, per SEC guidance; and
(4) Reported indicated mineral resources are equivalent to mineralized material under SEC Industry Guide 7.

Cautionary Note to United States Investors Regarding Estimates of Indicated Mineral Resources

This press release uses the terms "mineral resources" and "indicated mineral resources" which are defined in, and required to be disclosed by, Canadian National Instrument NI 43-101 (“NI 43-101”). We advise U.S. investors that these terms are not recognized under SEC Industry Guide 7. Accordingly, the disclosures regarding mineralization in this news release may not be comparable to similar information disclosed by Golden Minerals in the reports it files with the SEC. The estimation of measured resources and indicated resources involves greater uncertainty as to their existence and economic feasibility than the estimation of proven and probable reserves. U.S. investors are cautioned not to assume that any or all mineral resources are economically or legally mineable or that these mineral resources will ever be converted into mineral reserves. In addition, the SEC normally only permits issuers to report mineralization that does not constitute SEC Industry Guide 7 compliant “reserves” as in-place tonnage and grade without reference to unit amounts. U.S. investors are urged to consider closely the disclosure in our Form 10-K for the year ended December 31, 2019 and other SEC filings.

Review by Qualified Person and Quality Control

The technical contents of this press release have been reviewed by Matthew Booth, a Qualified Person for the purposes of NI 43-101. Mr. Booth has over 17 years of mineral exploration experience and is a Qualified Person member of the American Institute of Professional Geologists (CPG 12044).

To ensure reliable sample results, Golden Minerals uses a quality assurance/quality control program that monitors the chain of custody of samples and includes the insertion of blanks, duplicates and reference standards in each batch of samples. Core is photographed and sawn in half with one half retained in a secured facility for verification purposes. Sample preparation (crushing and pulverizing) is performed at an independent ISO 9001:2001 certified laboratory in Chihuahua or Zacatecas, Mexico. Prepared samples are direct-shipped to an ISO 9001:2001 certified laboratory in Canada.

About Golden Minerals

Golden Minerals is a Delaware corporation based in Golden, Colorado. The Company is primarily focused on advancing its Rodeo and Velarde?a properties in Mexico and, through partner-funded exploration, its El Quevar silver property in Argentina, as well as acquiring and advancing mining properties in Mexico, Argentina and Nevada.

Forward-Looking Statements

This press release contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended and Section 21E of the Securities Exchange Act of 1934, as amended, and applicable Canadian securities legislation, including statements regarding expectations surrounding the geologic potential of the Rodeo project. These statements are subject to risks and uncertainties, including the reasonability of the economic assumptions at the basis of the results of the Rodeo project Preliminary Economic Assessment and technical report; changes in interpretations of geological, geostatistical, metallurgical, mining or processing information; and interpretations of the information resulting from exploration, analysis or mining and processing experience. Golden Minerals assumes no obligation to update this information. Additional risks relating to Golden Minerals may be found in the periodic and current reports filed with the SEC by Golden Minerals, including the Company’s Annual Report on Form 10-K for the year ended December 31, 2019.

For additional information please visit http://www.goldenminerals.com/ or contact:

Golden Minerals Company
Karen Winkler, Director of Investor Relations
(303) 839-5060
SOURCE: Golden Minerals Company


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Golden Minerals Company
Bergbau
A3EHBF
US3811194030
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"