Suche
 
Folgen Sie uns auf:

Doré Copper Mining Corp. Files Technical Report for Joe Mann

10.09.2021  |  GlobeNewswire
TORONTO, Sept. 10, 2021 - Doré Copper Mining Corp. (the "Corporation" or "Dor? Copper") (TSXV: DCMC; OTCQX: DRCMF; FRA: DCM) is pleased to announce that further to its news release dated July 28, 2021, it has filed a technical report in compliance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") on the Company's Joe Mann property.

A copy of the Technical Report is available on the Company's profile on SEDAR at www.sedar.com and on the Company's website at https://www.dorecopper.com. The Technical Report focuses on a mineral resource estimate for the former Joe Mann mine. The report was prepared by SLR Consulting (Canada) Ltd., an independent global mining advisory and consulting firm.

Ernest Mast, President and Chief Executive Officer of the Corporation, commented: "Work is underway to complete a preliminary economic assessment (PEA) by year-end for our hub-and-spoke model which will include our flagship high-grade copper-gold Corner Bay deposit, along with the Devlin (copper) and Joe Mann (gold) deposits to supplement tonnage. Prior to end of September, we plan to issue a mineral resource update for Corner Bay which we expect will reach our key target of 5 million tonnes of resources."

About Dor? Copper Mining Corp.

Dor? Copper Mining Corp. is a copper-gold explorer and developer in the Chibougamau area of Qu?bec, Canada. The Corporation is focussed on implementing its hub-and-spoke development strategy by advancing its key high-grade copper-gold brownfield projects towards a restart of operations. Our goal is to achieve an annual production of 60 M lbs of copper equivalent (or 100,000 oz gold equivalent).

The Corporation has consolidated a large land package in the prolific Lac Dor?/Chibougamau and Joe Mann mining camps that has produced 1.6 billion pounds of copper and 4.4 million ounces of gold1. The land package includes 13 former producing mines, deposits and resource target areas within a 60-kilometre radius of the Company's 2,700 tpd mill (Copper Rand Mill).

Dor? Copper plans to deliver a PEA of its hub-and-spoke model in late 2021. Currently, the Corporation is completing a 30,000-metre drilling program at its Corner Bay (Cu-Au) project, of which approximately 19,000 meters will be included in an updated mineral resource estimate expected at the end of Q3 2021.

For further information, please visit the Corporation's website at www.Dor?copper.com or refer to Dor? Copper's SEDAR filings at www.sedar.com or contact:

Ernest Mast Laurie Gaborit
President and Chief Executive Officer Vice President, Investor Relations
Phone: (416) 792-2229 Phone: (416) 219-2049
Email: emast@Dor?copper.com Email: lgaborit@Dor?copper.com

Cautionary Note Regarding Forward-Looking Statements
This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. Forward-looking statements include predictions, projections and forecasts and are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "estimate", "forecast", "expect", "potential", "project", "target", "schedule", "budget" and "intend" and statements that an event or result "may", "will", "should", "could" or "might" occur or be achieved and other similar expressions and includes the negatives thereof. Specific forward-looking statements in this press release include, but are not limited to, completing a PEA by year-end, issuing a mineral resource update by end of September for Corner Bay which is expected to reach our key target of 5 million tonnes of resources, implementing a hub-and-spoke development strategy by advancing the Corporation's key high-grade copper-gold brownfield projects towards a restart of operations, and the Corporation's goal of achieving an annual production of 60 M lbs of copper equivalent (or 100,000 oz gold equivalent).

All statements other than statements of historical fact included in this release, including, without limitation, statements regarding the timing and ability of the Corporation to receive necessary regulatory approvals, and the plans, operations and prospects of the Corporation and its properties are forward-looking statements. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties and other factors which may cause actual results and future events to differ materially from those expressed or implied by such forward-looking statements. Such factors include, but are not limited to, actual exploration results, changes in project parameters as plans continue to be refined, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, uninsured risks, regulatory changes, delays or inability to receive required regulatory approvals, health emergencies, pandemics and other exploration or other risks detailed herein and from time to time in the filings made by the Corporation with securities regulators. Although the Corporation has attempted to identify important factors that could cause actual actions, events or results to differ from those described in forward-looking statements, there may be other factors that cause such actions, events or results to differ materially from those anticipated. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Corporation disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

1. Sources for historic production figures: Economic Geology, v. 107, pp. 963-989 - Structural and Stratigraphic Controls on Magmatic, Volcanogenic, and Shear Zone-Hosted Mineralization in the Chapais-Chibougamau Mining Camp, Northeastern Abitibi, Canada by Fran?ois Leclerc et al. (Lac Dor?/Chibougamau mining camp) and NI 43-101 Technical Report on the Joe Mann Property dated January 11, 2016 by Geologica Groupe-Conseil Inc. for Jessie Ressources Inc. (Joe Mann mine).

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Doré Copper Mining Corp.
Bergbau
A2PXPC
CA25821T1003
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"