Suche
 
Folgen Sie uns auf:

Yorbeau Reports Assay Results from the Lac Gamble Drilling Program on the Rouyn Gold Project, Québec; Drilling Underway on Augmitto - Cinderella Areas

16.09.2021  |  CNW

MONTREAL, Sept. 16, 2021 - Yorbeau Resources Inc. (TSX: YRB) ("Yorbeau" or the "Company") is pleased to report that its partner IAMGOLD Corporation (''IAMGOLD'') released today assay results from its its 2021 exploration diamond drilling program completed on the Lac Gamble zone at the Rouyn Gold project ("Rouyn Project"). The project is located 4 km south of Rouyn-Noranda, Québec, and approximately 45 kilometers southwest of IAMGOLD's Westwood operation.

The Company is reporting assay results from seven (7) diamond drill holes, totaling 1,826 metres completed as part of the winter 2021 drilling program. Drilling activities are also currently progressing on the Augmitto and Cinderella areas, located approximately 1 to 3 kilometres west of the Lac Gamble zone, and results will be reported when received, validated and compiled.

The assay results reported herein are provided in Table 1, below, and include the following highlights (a longitudinal section illustrating the drilling program on the Lac Gamble zone is attached to this news release):

Lac Gamble - Main Zone:

  • Drill hole GA-21-779:

7.7 metres grading 2.5 g/t Au


includes:

4.7 metres grading 3.5 g/t Au



  • Drill hole GA-21-780:

5.0 metres grading 5.5 g/t Au



  • Drill hole GA-21-782:

3.2 metres grading 16.1 g/t Au


includes:

1.2 metres grading 40.6 g/t Au

In a separate press release on the current results, Craig MacDougall, Executive Vice President, Growth, IAMGOLD, stated: "Our drilling program at Lac Gamble earlier this year specifically targeted some selected areas for possible extensions, as well as to complete some initial geotechnical drill holes to assess rock quality in the context of a potential underground mining scenario. The results continue to strengthen our understanding of the deposit geology and geotechnical rock quality appears in line with our expectations from the initial assessment. Despite the recent challenges faced by a shortage of available drilling rigs in the region, we continue to make solid progress in our project evaluation."

The diamond drilling program on the Lac Gamble zone had two main objectives: 1) complete an initial geotechnical drilling campaign to collect preliminary data to assess rock quality of the host rock units with respect to an underground mining method; and, 2) test for potential extensions down plunge along the western boundary of the zone.

The geotechnical drill program consisted of four (4) holes for 720.5 metres and the data obtained appears to be in line with the anticipated geotechnical conditions to support a potential underground mining development scenario.

The expansion drilling program targeted potential down-plunge extensions to the west for which three (3) diamond drill holes totaling 1,105 metres were completed. Unfortunately, due to the late start of the drilling program caused by a regional lack of drill rig availability, a planned larger program could not be completed during the optimal winter season.

All drill holes successfully intersected the targeted sheared Cadillac-Piché corridor, which hosts the mineralized Lac Gamble zone. The zone is associated with alteration varying from several metres to greater than 10 metres in width, exhibiting variable carbonatization, fuchsite, silicification, crosscut by a network of white quartz and brown tourmaline stockwork veins and breccias. Gold mineralization occurs as small specks of visible free gold associated with minor sulphides in quartz-tourmaline veinlets. Hole GA-21-782 has demonstrated the zone could extend further in its western extensions at depth.

Next Steps

The ongoing global COVID-19 pandemic continues to impact the local availability of exploration services. However, exploration drilling has resumed at the Rouyn Project in June and a planned 9,000 metre diamond drilling program is in progress to evaluate the resource potential of other selected targets, including the Cinderella and Augmitto areas located further west of the Lac Gamble zone and if timing permits to the east at the Astoria east zone.

The assay results from the drilling programs will be integrated with the existing geological, geochemical and structural information to support the development and refinement of preliminary deposit models on the property to support a future potential maiden resource estimate.

About the Rouyn Gold Project

The Rouyn Gold Property is located about 4 km south of Rouyn-Noranda, Quebec. With a long history of mining, the city of Rouyn-Noranda offers many advantages for mining and exploration, including political and social stability, good access and infrastructure, skilled mining personnel, and one of the most mining-friendly jurisdictions in the world.

The property covers a 12-kilometre stretch of the Cadillac-Larder Lake Break and contains four known gold deposits along the 6-km Augmitto-Astoria corridor situated on the western portion of the property. Two of the four deposits, Astoria and Augmitto, benefit from established underground infrastructure and have been the subject of technical reports that include resource estimates that were previously filed in accordance with Regulation NI 43-101.

The Lac Gamble zone is located between the Augmitto and the Astoria deposits. The exploration target potential at Lac Gamble is interpreted to be between 400,000 and 600,000 ounces of gold at a grade between 7.0 and 8.5 g/t Au. The potential quantity and grade of the exploration targets referred to are conceptual in nature and insufficient exploration work has been completed to define a mineral resource. The property may require significant future exploration to advance to a resource stage and there can be no certainty that the exploration target will result in a mineral resource being delineated. The exploration targets are consistent with similar deposits in the area, deposit models or derived from initial drilling results.

IAMGOLD holds a purchase option with Yorbeau for the Rouyn Project. Under the terms of the purchase option agreement, IAMGOLD can acquire a 100% interest in the project by completing remaining scheduled cash payments totaling C$1.5 million and remaining exploration totaling approximately C$3.7 million by December 2022 (as of June 30, 2021). By the end of the expenditure period, the Company must complete a resource estimate in accordance with NI 43-101, after which the Company, at its election, can purchase a 100% interest in the project, subject to a 2% net smelter return, by paying Yorbeau the lesser of C$15 per resource ounce or C$30 million.

Figure 1 - Rouyn Gold - Lac Gamble zone longitudinal section and highlighted 2021 assay results

Table 1: Rouyn Project Drilling Results - 2021 Lac Gamble Drilling program

Notes:

1.

True widths of intersections are estimated at at 64 to 93% of the core interval approximately.

2.

Drill hole intercepts are calculated with a lower cut of 1.0 g/t Au and may contain lower grade interval of up to 3 metres in length. They are generally reported with a minimum g*m (or Metal factor) of 2.

3.

Assays are reported uncut but high grade sub-intervals are highlighted.

Technical Information and Quality Control Notes

The drilling results contained in this news release have been prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects. Work at Yorbeau is carried out under the supervision of Sylvain Lépine, M.Sc, P. Geo. He is a qualified person (as defined by NI 43-101) and has reviewed and approved the content of this release.

The design of the drilling program and interpretation of results is under the control of IAMGOLD's and Yorbeau's geological staff, including QPs employing strict protocols consistent with NI 43-101 and industry best practices. The sampling of, and assay data from, the drill core is monitored through the implementation of a quality assurance - quality control (QA-QC) program. Drill core (NQ size) is logged and samples are selected by geologists and then sawn in half with a diamond saw at the project site. Half of the core is retained at the site for reference purposes. Sample intervals may vary from 0.5 to 1.5 metres in length depending on the geological observations.

Half-core samples are packaged and transported in sealed bags to AGAT laboratories in Val d'Or, Québec, and Mississauga, Ontario. Samples are coarse crushed to a -10 mesh and then a 1,000 gram split is pulverized to 95% passing -150 mesh. AGAT prepare analytical pulps at their facilities located in Val-d'Or and processed the pulps at their Mississauga laboratory which is ISO / IEC 17025:2005 certified by the Standards Council of Canada. Samples are analyzed using a standard fire assay with a 50 gram charge with an Atomic Absorption (AA) finish. For samples that return assay values over 3.0 grams per tonne, another pulp is taken and fire assayed with a gravimetric finish. Core samples showing visible gold or samples which have returned values greater than 10.0 grams per tonne are processed with a protocol involving fine grinding of the entire sample, followed by metallic screen analysis of the entire pulverized material. Insertion of duplicate, blanks and certified reference standards in the sample sequence is done in all drill holes for quality control.

About Yorbeau Resources Inc.

The Rouyn Property, wholly-owned by the Company, contains four known gold deposits in the 6-km-long Augmitto-Astoria corridor situated on the western portion of the property. The Company signed a definitive agreement in December 2018, whereby IAMGOLD has the option to acquire a 100% interest in the Rouyn property, and a major drilling program is underway. Two of the four deposits, Astoria and Augmitto, benefit from substantial underground infrastructure and have been the subject of technical reports that include resource estimates and that were filed in accordance with Regulation 43-101. In 2015, the Company expanded its exploration property portfolio by acquiring strategic base metal properties in prospective areas of the Abitibi Belt of Quebec that feature infrastructure favourable for mining development. The newly acquired base metal properties include the Scott Project in Chibougamau, which bears important mineral resources (see the press release dated March 30, 2017) and on which a positive Preliminary Economic Assessment was recently completed.

For additional information on the Company, consult its website at www.yorbeauresources.com.

Forward-looking statements: Except for the statement of historical fact, all statements in this news release, including without limitation, regarding the prospects of the Rouyn project, drilling results, future plans and objectives are forward-looking statements which involve risks and uncertainties. There can be no assurance that such statements will prove to be accurate; actual results and future events could differ materially from those anticipated in such statements. Yorbeau disclaims any obligation to update such forward-looking statements, other than as required by applicable securities laws.

SOURCE Yorbeau Resources Inc.



Contact
G. Bodnar Jr., President, Chief Financial Officer, Yorbeau Resources Inc., gbodnar@yorbeauresources.com, Tel: 514-384-2202; Sylvain Lépine, M.Sc, P. Geo, Vice-President Exploration, Yorbeau Resources Inc., slepine@yorbeauresources.com, Tel: 819-277-0577; Toll free in North America: 1-855-384-2202
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Yorbeau Resources Inc.
Bergbau
872300
CA9861913023
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"