Suche
 
Folgen Sie uns auf:

Positive Scoping Study for Cummins Range Shows Potential for Sustainable, Long-Life Rare Earths Project

12.09.2022  |  Accesswire

HIGHLIGHTS

  • Strong financials with attractive NPV, IRR and payback period and low cash costs.
  • Significant production profile of sustainably, Australian produced rare earth and phosphate products with local placement opportunities.
  • Scoping Study base only on current 2021 Indicated and Inferred Resources with 85% of the mine plan in the Indicated category.
  • Study considers the utilisation of grid-connected hydroelectric power for refinery operations, a potential world first for rare earth refineries.
  • Board approves commencement of Pre-Feasibility Study

PERTH, September 12, 2022 - Rarex Ltd. (RareX) (ASX:REE) is pleased to report positive outcomes from a Scoping Study (Scoping Study, the Study) completed on its 100% owned Cummins Range Rare Earths Project (the Project, Cummins Range), located in the Kimberley region of WA. The Scoping Study was led by Primero with support from Mining Plus among other leading consultancies.

RareX Managing Director, Jeremy Robinson, said: "This Scoping Study shows that the Cummins Range Project has the potential to be a world leader in the application of low carbon energy solutions to rare earths projects. The Project's maximum resource utilisation and refining capacity powered by green hydroelectric power, demonstrate RareX's commitment to reducing its potential carbon footprint. The Study has been based on the current 2021 Resource and has good potential to grow in scale in the coming 12 months."

The Study demonstrates a potentially viable project and has given the Board of RareX the confidence to approve the commencement of a Pre-Feasibility Study (PFS) which will commence in Q3 2022.

This Study is an order of magnitude technical and economical assessment and is partially supported by Inferred Mineral Resources. The Study includes appropriate assessment of realistically assumed modifying factors together with other relevant operational factors.

The Project concept outlined in the Scoping Study comprises a mine and flotation beneficiation facility at site producing a rare earth mineral concentrate and a phosphate mineral concentrate which is trucked along mainly sealed roads to Wyndham Port. At Wyndham Port, a hydroelectric powered rare earth refinery facility is envisaged which produces a mixed rare earth carbonate (MREC) product for export with a by-product of merchant grade phosphoric acid. Additional to these products is the phosphate mineral concentrate which itself contains elevated rare earth grades.

Both phosphate products (phosphoric acid and mineral concentrate) have a market in the fertiliser sector and there is an opportunity for RareX to participate in the production of fertilisers by reacting the self-generated phosphoric acid with the mineral concentrate from the mine site, however, this was outside of the scope of this Study.

Products have been priced according to their grades and market intelligence. MREC pricing is based on the Cummins Range basket price of US$29.31/kg backed by industry knowledge and information from international metals market analysis and pricing index companies. Phosphate pricing is based on market sources. Additionally, a pricing credit is assumed for the phosphate mineral concentrate which contains appreciable rare earths.

Further opportunity exists to produce a combined phosphate and rare earth mineral concentrate at site - allowing for reduced site infrastructure - with separation and processing at port. This should result in a substantially larger mining operation.

Key Project Metrics

Financial Units Value
Total Capital Expenditure AU$ million 430
Discount Rate (pre-tax, nom) % 8.0 %
NPV8 AU$ million 633
IRR (pre-tax, nom) % 29 %
Payback Yrs 2.8
LOM EBITDA AU$ billion 1.9
Products Units Volume
MREC Product (dry) Ktpa 8.9
Phosphate Concentrate Produced (dry) Ktpa 128.8
Phosphoric Acid Produced Ktpa 13.5
Capex split2F[1] Units Value
Cummins Range Mine Site and Beneficiation AU$ million 200
Wyndham Port Refinery Facility AU$ million 229
Opex Units Value
Cash Costs AU$/kg TREO in MREC 26.63
By-Product Credit AU$/kg TREO in MREC (20.5)4
Cash Costs (after credit) AU$/kg TREO in MREC 6.15
Product price Units Value
Basket price (ex Sc2O3) US$/t 29,310
MREC Price (FOB) US$/t 13,580
Phosphate Price inc. REO Credit (FOB) US$/t 405
Phosphoric Acid Price (FOB) US$/t 926

For more information, please contact:

Investors: Jeremy Robinson, Managing Director Ph: +61 8 6383 6593
Media: Nicholas Read, Read Corporate Ph: +61 8 9388 1474
info@rarex.com.au

SOURCE: Rarex Ltd.



View source version on accesswire.com:
https://www.accesswire.com/715495/Positive-Scoping-Study-for-Cummins-Range-Shows-Potential-for-Sustainable-Long-Life-Rare-Earths-Project


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Rarex Ltd.
Bergbau
A2PWGN
AU0000068579
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"