Suche
 
Folgen Sie uns auf:

Rokmaster Commences Field Work on the Nechako Porphyry Cu-Au-Mo and Epithermal Au-Ag Project and Updates Its Selkirk Precious and Base Metals Project

15.07.2024  |  CNW

VANCOUVER, July 15, 2024 - Rokmaster Resources Corp. (TSXV: RKR) (OTCQB: RKMSF) (FSE: 1RR1) ("Rokmaster" or "the Company") announces that field work has begun on the Nechako Copper-Gold-Silver Project.

Crews completed an initial small prospecting and soil sampling program on the Mystery Property targeting porphyry copper-gold-molybdenum targets.

Crews also completed additional field work on the Fox-Coconut Property. The field work included geological mapping, prospecting, rock and soil sampling to further characterize the exploration targets on the Fox-Coconut Property where channel samples collected in 2014 returned a highlighted value of 7,342 grams per tonne ("gpt") silver and 45.3 gpt gold over 1.0 meter. Additional planned field work on the Mystery Property aims to further refine and expand on the large porphyry alteration zone and coincident large copper in soil anomalies which is suggestive of a porphyry copper-gold environment. See Rokmaster News Release dated May 15, 2024.

On Rokmaster's 100% owned Selkirk Project, located 30 km north of Revelstoke, BC, the Company has applied for drilling permits for Downie Gold and Keystone Properties targeting gold-silver-zinc-copper mineralization. The Rokmaster website provides further details on the Downie Gold, Keystone, and Rift Properties which comprise the Selkirk Project.

Scientific and technical information presented above has been prepared in accordance with Canadian regulatory requirements as set out in National Instrument 43-101 and reviewed and approved by Eric Titley, P.Geo., a Qualified Person as defined by National Instrument 43-101 Standards of Disclosure for Mining Projects, has reviewed and approved of the technical disclosure in this news release.

On Behalf of the Board of Directors of

Rokmaster Resources Corp.

John Mirko,
President & Chief Executive Officer.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term in defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS: This news release may contain forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," 'projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company's properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from Rokmaster's operations and other risks and uncertainties. Any forward-looking statement speaks only as of the date it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future vents or results or otherwise.

SOURCE Rokmaster Resources Corp.



Contact
For project information please contact: Mr. John Mirko, President & CEO of Rokmaster Resources Corp., jmirko@rokmaster.com, Ph. +1(604)290-4647 or by website: www.rokmaster.com; For shareholder information please contact: Mike Kordysz, mkordysz@rokmaster.com, Ph. +1(604)319-3171
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Rokmaster Resources Corp.
Bergbau
A2JK8F
CA77543A2083
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"