Suche
 
Folgen Sie uns auf:

Delta Resources Receives Exploration Permits Ahead of 2025 Drilling at the Delta-1 Expanded Property and Grants Stock Options

26.11.2024  |  Newsfile
Montreal, Nov. 26, 2024 - Delta Resources Ltd. (TSXV: DLTA) (OTC Pink: DTARF) (FSE: 6G01) ("Delta" or "The Company") is pleased announce that it has received two exploration permits to allow for early-stage mineral exploration at the Delta-1 Expanded property in the Thunder Bay District of Ontario. Over 90% of the Delta-1 Expanded property is now permitted for early-stage exploration which includes diamond drilling (see figure 1).

Figure 1: Geology map of the Shebandowan belt showing the area covered by the Delta-1 Expanded property and showing the area within the property that is currently permitted for early-stage exploration (including diamond drilling).

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8482/231404_delta1en.jpg

Delta has granted 4,005,000 stock-options to management, the board of directors, employees and consultants. The options are exercisable at $0.20 for 3 years from the date of the grant and vest immediately.

About Delta Resources Limited

Delta Resources Limited is a Canadian mineral exploration company focused on growing shareholder value through the exploration of two very high-potential gold and base-metal projects in Canada.

DELTA-1 is Delta's flagship project, where the company is building on a large gold inventory 50 kilometres west of Thunder Bay, Ontario, at surface and adjacent to the Trans-Canada highway. To date, the gold mineralization is defined over a strike length of 2.5 km, from surface to a vertical depth of 300 m. Highlights include drill intercepts such as 5.92 g/t Au over 31 m (incl. 14.8 g/t Au over 11.9 m), and 1.79 g/t Au over 128.5 m. The property covers 308 square kilometres where Delta has identified multiple corridors of intense alteration and deformation, on strike with, and to the south of the Eureka gold zone and that has yet to be thoroughly explored.

The DELTA-2 property covers 205 square kilometres in the prolific Chibougamau District of Quebec. The property holds excellent potential for gold-rich polymetallic VMS deposits as well as hydrothermal-gold deposits. Delta targets VMS deposits such as the LeMoine past producer where 0.76 Mt were mined between 1975 and 1983, grading 9.6% Zn, 4.2% Cu, 4.5 g/t Au and 84 g/t Ag.

ON BEHALF OF THE BOARD OF DELTA RESOURCES LIMITED.

Frank Candido
Chairman
www.deltaresources.ca

For Further Information:

Delta Resources Limited

Andre C. Tessier, President and CEO
Tel: 613-328-1581
atessier@deltaresources.ca

or

Frank Candido, Chairman
Tel: 514-969-5530
fcandido@deltaresources.ca

We seek safe harbor. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. The TSX Venture Exchange has not approved nor disapproved of the information contained herein.

Cautionary Note Regarding Forward Looking Information

Some statements contained in this news release are "forward-looking information" within the meaning of Canadian securities laws. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", "believes" or variations of such words and phrases (including negative or grammatical variations) or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connotation thereof. Investors are cautioned that forward-looking information is inherently uncertain and involves risks, assumptions and uncertainties that could cause actual facts to differ materially. There can be no assurance that future developments affecting the Company will be those anticipated by management. The forward-looking information contained in this press release constitutes management's current estimates, as of the date of this press release, with respect to the matters covered thereby. We expect that these estimates will change as new information is received. While we may elect to update these estimates at any time, we do not undertake to update any estimate at any particular time or in response to any particular event.

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Delta Resources Ltd.
Bergbau
A2PN02
CA24780P1009
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"