New Drilling Results: Figure 1: Location of drill hole collars MA-18-336 to MA-18-343 and extended MA-17-216, Marathon Deposit Drill holes into the southwestern end of the Marathon Deposit intersected new zones of high-grade gold in areas of previous minimal drilling : MA-18-343 intersected 17.39 g/t Au over 5.0 meters with 42.76 g/t Au over 2.0 [...]
Marathon Gold Corp. is pleased to announce that it has filed a National Instrument 43-101 Technical Report Economic Assessment in respect of the Company's Valentine Lake Gold Project. The technical report is available for review on SEDAR and on the Company’s website The results of the Preliminary Economic Assessment were originally presented [...]
Highlights: Figure 1: Location of drill hole collars MA-18-321 to MA-18-323, MA-18-325 to MA-18-326, and MA-18-329 to MA-18-335, Marathon Deposit. Drilling Infill drill holes MA-18-330 and MA-18-334 succeeded in intersecting high-grade gold intervals that extend along strike to both the northeast and southwest into adjacent zones of previously [...]
Marathon Gold Corp. announced today its financial results for the three and nine months ended September 30, 2018. With the completion of the initial preliminary economic assessment on the Valentine Lake project in May 2018 and the updated PEA in October 2018, Marathon’s focus with respect to Valentine Lake is on the exploration and [...]
Marathon Gold Corp. is pleased to announce the excellent results from an updated independent Preliminary Economic Assessment study on its 100% owned Valentine Lake Gold Camp that was led by John T. Boyd Company and Lycopodium Minerals Canada. The new PEA optimizes the development of the Valentine Lake Gold Camp mineral resource by open pit mining [...]
Highlights: Figure 1: Location of drill hole collars MA-18-309 to MA-18-320, MA-18-324, MA-18-327 and MA-18-328, Marathon Deposit. Drilling Drill holes MA-18-327 and MA-18-328 succeeded in extending higher-grade gold intervals further into the southwest end of the Marathon Deposit open pit with MA-18-328 intersecting 5.75 g/t Au over 16.0 meters [...]
Highlights: Schematic cross section 17340 showing MA-18-305, Marathon Deposit Location of drill hole collars MA-18-304 to MA-18-308, Marathon Deposit Drilling MA-18-305 intersected 1.41 g/t Au over 105.0 meters including 4.59 g/t Au over 6.0 meters, 7.65 g/t Au over 4.0 meters, 4.90 g/t Au over 2.0 meters and 3.51 g/t Au over 2.0 meters as well as [...]
Marathon Gold Corp. CEO Phillip Walford is joining the latest “Stock Day” podcast with Uptick Newswire’s Everett Jolly. Walford updates Jolly on the Canadian company’s current and future works, highlighted by the Valentine Lake project. Walford says a Preliminary Economic Assessment study shows the open pit area should [...]
Highlights: Drilling MA-18-303 intersected 1.54 g/t Au over 149.0 meters including 6.60 g/t Au over 5.0 meters, 6.35 g/t Au over 6.0 meters and 4.86 g/t Au over 6.0 meters as well as 1.47 g/t Au over 10 meters including 8.08 g/t Au over 1 meter and 6.54 g/t Au over 3.0 meters. The hole was an infill hole planned to fill in a 100 m vertical gap [...]
Highlights: Map of the > 2.2 km long Victory Gold Trend showing the newly discovered 1.5 km SW extension of the gold zone as well as new trench locations, channel and grab sample gold grades and the Victory Deposit May 2018 resource pit shell which is currently open in all directions, Valentine Gold Camp. Visible gold exposed in [...]
Marathon Gold Corp. announced today its financial results for the three and six months ended June 30, 2018. With the completion of the preliminary economic assessment on the Valentine Lake project, Marathon’s focus with respect to Valentine Lake has progressed toward development as opposed to a pure exploration focus. Marathon completed the [...]
Marathon Gold Corp. is pleased to announce the appointment of Robbert Borst as Chief Operating Officer of the Company effective August 1, 2018. Mr. Borst successfully managed the company’s initial Preliminary Economic Assessment for the Valentine Lake Gold Camp which was released on May 17, 2018. Mr. Borst brings over 30 years of experience [...]