Highlights: Figure 1: Drill holes MA-17-226 to MA-17-235, Marathon Deposit, Valentine Lake Gold Camp Results of infill, sub-vertical drill holes penetrating downward perpendicular to the en-echelon stacked quartz-tourmaline-pyrite-gold veining in the Main Zone corridor of the Marathon Deposit. Property-wide resource update will be released in late [...]
TORONTO, Nov. 15, 2017 (GLOBE NEWSWIRE) -- Marathon Gold Corp. (TSX:MOZ) (“Marathon”) announced today its financial results for the period ended September 30, 2017. Highlights: At September 30, 2017 Marathon had $17.4 million in cash and cash equivalents compared to $8.5 million at December 31, 2016. Marathon completed the following [...]
TORONTO, Nov. 14, 2017 -- Marathon Gold Corp.Marathon Gold Corp. is pleased to announce that it has acquired the 3% precious metals NSR royalty and the 2% base metals NSR royalty on its Valentine Lake gold property in central Newfoundland from a third party for US$8.7 million. Marathon believes this purchase is in the best interest of the Company [...]
Highlights: FIGURE 1: Drill holes MA-17-215 to MA-17-225, Marathon Deposit, Valentine Lake Gold Camp • Results of infill, subvertical drill holes penetrating downward perpendicular to the en-echelon quartz-tourmaline-pyrite-gold (QTP) veining in the Main Zone corridor (“m” meters, “TT” true [...]
Marathon Gold is pleased to report very positive results from new drilling at the Marathon Deposit, Valentine Lake Gold Camp, central Newfoundland. Additional infill drilling, down through the 75-100-meter wide and more than 500-700-meter deep mineralized corridor of the Marathon Deposit, has further confirmed the continuity of good gold grades [...]
Marathon Gold is very pleased to report continued positive results from the latest drill holes designed to penetrate down through the en-echelon stacked quartz-tourmaline-pyrite-gold (QTP) veining of the Main Zone corridor of the Leprechaun Deposit, Valentine Lake Gold Camp, central Newfoundland. The new drill holes VL-17-655 and VL-16-656, along [...]
TORONTO, Sept. 25, 2017 (GLOBE NEWSWIRE) -- Marathon Gold Corp. (“Marathon” or the “Company”) (TSX:MOZ) is pleased to announce the appointment of Janice Stairs, LLB, MBA to Marathon’s board of directors effective immediately. Janice Stairs has over 25 years’ experience working with companies involved in the [...]
Marathon Gold is pleased to report the very positive results of new drilling down through the en-echelon stacked quartz-tourmaline-pyrite-gold veining of the Main Zone corridor at the Leprechaun Deposit. The new drilling confirms the continuity of excellent gold grades down through the more than 350-m deep and 25-60-m wide mineralized Main Zone [...]
TORONTO, Sept. 11, 2017 (GLOBE NEWSWIRE) -- Marathon Gold Corp. (“Marathon” or the “Company”) (TSX:MOZ) Marathon Gold is pleased to announce the addition of Mr. Robbert Borst to manage the company’s upcoming PEA. He will be starting with Marathon effective October 1, 2017. Mr. Borst brings over 30 years of experience [...]
TORONTO, Sept. 07, 2017 (GLOBE NEWSWIRE) -- Marathon Gold Corp. (“Marathon” or the “Company”) (TSX:MOZ) is pleased to report continued positive drill results from the Marathon Deposit, Valentine Lake Gold Camp, central Newfoundland. New infill drilling further confirms the continuity of good gold grades through the [...]
Marathon Gold is delighted to release excellent results from new infill drilling at the Marathon Deposit, Valentine Lake Gold Camp, central Newfoundland. Drill hole MA-17-188, drilled sub-vertical down through the main mineralized corridor, intersected continuous mineralization down-hole with 2.13 g/t Au over 326.0 meters with wide higher-grade [...]
Marathon Gold is pleased to announce very positive results from infill and exploration drilling at the Marathon Gold Deposit, Valentine Lake Gold Camp, central Newfoundland. Drill holes MA-17-184 and MA-17-186, designed to drill sub-vertical down through the main mineralized corridor, intersected wide intervals of good gold grades including 1.61 [...]