Richmont Mines Inc.: Island Gold Deep 43-101 Report Filed on Sedar; New Drill Results Continue to Show Island Gold Mine Deep Potential

12.04.2013  |  Marketwired

MONTREAL, QUEBEC -- (Marketwired) -- 04/12/13 -- Richmont Mines Inc. (TSX: RIC)(NYSE MKT: RIC), ("Richmont" or the "Corporation") is pleased to announce additional Island Gold Deep drill results, and that the 43-101 technical report for the Island Gold Deep Mineral Resource estimate, published February 25, 2013, has been filed on SEDAR (www.sedar.com).


Highlights:



-- C Zone unpublished drill results included in the January 2013 Island
Gold Deep C Zone Mineral Resource estimate include (all cut grades over
true widths): 36.91 g/t Au over 2.05 metres, 20.06 g/t Au over 4.48
metres, 15.50 g/t Au over 5.25 metres, 6.94 g/t Au over 11.87 metres,
and 25.73 g/t Au over 2.02 metres;

-- New C Zone drill results not incorporated in the resource include (all
cut grades over true widths): 7.94 g/t Au over 5.75 metres, 7.28 g/t Au
over 8.90 metres and 9.41 g/t Au over 2.73 metres;

-- Additional new drill results include (all cut grades over true widths):
20.64 g/t Au over 3.40 metres, 17.48 g/t Au over 3.32 metres, 17.53 g/t
Au over 3.06 metres, 13.64 g/t Au over 9.62 metres and 10.04 g/t Au over
6.20 metres in presently undefined zones, which are sub-parallel to the
C Zone (referred to as "X" Zone);

-- A 43-101 technical report for the C Zone Inferred Mineral Resource
estimate as of January 25, 2013, and published on February 25, 2013
(Island Gold Deep project), has been filed on SEDAR (www.sedar.com);

-- There are currently 3 drill rigs active on the Island Gold Deep project
from underground drill stations.


Paul Carmel, President and CEO, commented: "We are very pleased with the continued strong drill results at depth at Island Gold, as they reaffirm our confidence in the long-term potential to increase the mine life of this operation. We have not defined the limits of the various zones, and our goal is to expand this project's existing inferred Mineral Resource of 508,000 gold ounces at a grade of 10.73 g/t Au, released in February. To this end, we will be drilling 39,000 metres in 2013, and have begun work on an underground exploration drift that, once completed, will allow for better drilling access to the area between the two dykes on the property. The dykes occur at the eastern boundary of the currently defined deep resource. They are post-mineralized structures and they cut the mineralization perpendicularly, as witnessed in the upper horizons of the mine (see longitudinal). I am also pleased to say that work to extend the ramp to access the Deep C Zone has begun."

Chart 1: Longitudinal Section - Island Gold Mine: Deep drilling exploration results



----------------------------------------------------------------------------
TABLE 1: NEW ISLAND GOLD DEEP DRILL RESULTS(1)
NOT INCLUDED IN JANUARY 2013 INFERRED MINERAL RESOURCE ESTIMATE
----------------------------------------------------------------------------
Hole Length From To True
Number (metres) (metres) (metres) Width
(metres)
-----------------------------------------------------------------
400-514-08 588.00 411.93 417.34 3.06
---------------------------------------
including 412.23 413.01 0.44
-----------------------------------------------------------------
400-514-11 804.00 714.90 719.90 2.02
---------------------------------------
including 718.70 719.30 0.24
-----------------------------------------------------------------
400-514-13A 683.20 570.00 576.60 3.25
-----------------------------------------------------------------
400-514-23 645.00 489.58 496.33 3.32
---------------------------------------
including 489.58 489.98 0.20
---------------------------------------
including 494.80 495.83 0.51
---------------------------------------
616.48 627.00 5.30
---------------------------------------
including 616.48 617.26 0.39
-----------------------------------------------------------------
400-514-26 531.00 392.91 399.45 4.47
---------------------------------------
including 398.47 398.81 0.23
-----------------------------------------------------------------
400-514-28 696.20 662.66 671.36 3.87
-----------------------------------------------------------------
400-516-03 435.00 324.60 333.55 5.75
---------------------------------------
including 326.00 326.80 0.51
-----------------------------------------------------------------
400-516-04 558.00 399.00 407.28 4.69
---------------------------------------
including 421.50 430.00 5.00
-----------------------------------------------------------------
400-516-06W1 576.00 499.88 520.00 8.90
---------------------------------------
including 500.60 501.14 0.24
-----------------------------------------------------------------
425-487-08 846.00 780.72 792.50 3.40
-----------------------------------------------------------------
425-487-11 598.81 430.00 442.50 6.20
-----------------------------------------------------------------
425-487-12 667.00 506.64 513.52 2.74
---------------------------------------
including 508.00 508.62 0.25
---------------------------------------
524.00 529.15 2.06
---------------------------------------
including 525.00 526.00 0.40
---------------------------------------
594.82 600.60 2.33
-----------------------------------------------------------------
435-478-01 690.00 536.00 541.50 2.60
---------------------------------------
584.40 590.70 3.06
-----------------------------------------------------------------
435-478-06 783.00 551.66 560.00 2.73
---------------------------------------
including 552.54 553.00 0.15
---------------------------------------
578.00 583.15 1.74
---------------------------------------
including 582.65 583.15 0.17
---------------------------------------
617.55 622.15 1.53
---------------------------------------
626.15 648.95 7.62
---------------------------------------
700.00 708.00 2.76
-----------------------------------------------------------------
425-487-14 550.00 470.20 481.00 5.64
-----------------------------------------------------------------
425-487-15 576.00 456.70 465.33 4.36
---------------------------------------
including 458.93 459.28 0.18
-----------------------------------------------------------------
425-487-17 600.54 398.00 402.65 2.09
---------------------------------------
466.00 475.10 4.20
---------------------------------------
533.23 553.50 9.62
---------------------------------------
including 544.16 544.60 0.21
---------------------------------------
including 548.48 549.12 0.30
-----------------------------------------------------------------
435-478-05 615.00 390.70 394.10 1.85
-----------------------------------------------------------------
435-478-08A 468.00 330.00 334.12 2.61
-----------------------------------------------------------------
435-478-09 666.00 575.25 581.20 1.75
-----------------------------------------------------------------
GD-468-01W1 1,176.00 975.32 979.23 1.75
---------------------------------------
983.29 987.65 1.95
---------------------------------------
including 987.29 987.65 0.16
-----------------------------------------------------------------
TOTAL 13,762.75
-----------------------------------------------------------------

Hole Length Uncut Cut Zone(3) Vertical depth of
Number (metres) Grade Grade(2) Intersection(metres)
(g/t Au) (g/t Au)
-----------------------------------------------------------------------------
400-514-08 588.00 45.45 17.53 X 702
---------------------
including 268.69 75.00
-----------------------------------------------------------------------------
400-514-11 804.00 6.97 6.97 X 1,002
---------------------
including 42.68 42.68
-----------------------------------------------------------------------------
400-514-13A 683.20 5.70 5.70 X 860
-----------------------------------------------------------------------------
400-514-23 645.00 29.49 17.48 X 793
---------------------
including 134.00 75.00
---------------------
including 125.46 69.60
---------------------------------------------------
47.59 10.11 X 895
---------------------
including 580.50 75.00
-----------------------------------------------------------------------------
400-514-26 531.00 5.00 5.00 C 654
---------------------
including 54.70 54.70
-----------------------------------------------------------------------------
400-514-28 696.20 1.56 1.56 C 955
-----------------------------------------------------------------------------
400-516-03 435.00 7.94 7.94 C 622
---------------------
including 42.80 42.80
-----------------------------------------------------------------------------
400-516-04 558.00 4.03 4.03 C 695
---------------------------------------------------
including 4.27 4.27 X 759
-----------------------------------------------------------------------------
400-516-06W1 576.00 7.28 7.28 C 817
---------------------
including 54.59 54.59
-----------------------------------------------------------------------------
425-487-08 846.00 20.99 20.64 X 1,148
-----------------------------------------------------------------------------
425-487-11 598.81 10.04 10.04 X 766
-----------------------------------------------------------------------------
425-487-12 667.00 5.82 5.82 X 848
---------------------
including 40.60 40.60
---------------------------------------------------
12.88 9.39 X 862
---------------------
including 120.00 75.00
---------------------------------------------------
3.42 3.42 X 921
-----------------------------------------------------------------------------
435-478-01 690.00 7.98 7.98 X 884
---------------------------------------------------
5.06 5.06 X 922
-----------------------------------------------------------------------------
435-478-06 783.00 15.25 9.41 C 937
---------------------
including 181.00 75.00
---------------------------------------------------
14.58 13.45 X 959
---------------------
including 86.62 75.00
---------------------------------------------------
5.77 5.77 X 993
---------------------------------------------------
5.13 5.13 X 1,009
---------------------------------------------------
6.05 6.05 X 1,066
-----------------------------------------------------------------------------
425-487-14 550.00 7.56 7.56 X 807
-----------------------------------------------------------------------------
425-487-15 576.00 6.37 5.39 X 793
---------------------
including 99.25 75.00
-----------------------------------------------------------------------------
425-487-17 600.54 5.66 5.66 X 752
---------------------------------------------------
4.08 4.08 X 807
---------------------------------------------------
20.45 13.64 X 863
---------------------
including 344.89 75.00
---------------------
including 105.06 75.00
-----------------------------------------------------------------------------
435-478-05 615.00 2.32 2.32 X 721
-----------------------------------------------------------------------------
435-478-08A 468.00 6.23 6.23 C 668
-----------------------------------------------------------------------------
435-478-09 666.00 1.49 1.49 C 971
-----------------------------------------------------------------------------
GD-468-01W1 1,176.00 14.01 9.45 X 945
---------------------------------------------------
11.80 9.57 X 953
---------------------
including 102.02 75.00
-----------------------------------------------------------------------------
TOTAL 13,762.75
-----------------------------------------------------------------------------
(1) Please see the Regulation 43-101 at the end of this release for full
analysis details.
(2) High values are cut at 75 g/t.
(3) "X" corresponds to presently undefined zones, sub-parallel to the C
Zone, and found mainly in the hanging wall of the C Zone.


Table 2 below includes previously unpublished drill results for the C Zone that are included in the Inferred Mineral resource estimate that was announced on February 25, 2013, the details of which are outlined in the 43-101 technical report filed on SEDAR (www.sedar) on April 11, 2013. Of particular note are the several high gold grades that were subjected to the 75 g/t cut-off.



----------------------------------------------------------------------------
TABLE 2: ISLAND GOLD DEEP - C ZONE DRILL RESULTS(1)
INCLUDED IN JANUARY 2013 INFERRED MINERAL RESOURCE ESTIMATE
----------------------------------------------------------------------------
Hole Length From To True
Number (metres) (metres) (metres) Width
(metres)
------------------------------------------------------------
400-514-03 486.00 405.27 408.87 2.05
------------------------------------
including 406.05 407.75 0.97
------------------------------------------------------------
400-514-10 480.00 374.37 380.70 4.48
------------------------------------
including 378.50 379.90 0.99
------------------------------------------------------------
400-514-13A 683.20 535.76 546.50 5.25
------------------------------------
including 535.76 537.03 0.62
------------------------------------------------------------
400-514-15 732.00 682.00 691.20 3.62
------------------------------------
including 683.77 684.90 0.45
------------------------------------------------------------
400-514-21D 669.00 496.20 517.00 11.19
------------------------------------
including 499.20 500.56 0.73
------------------------------------------------------------
400-514-22 555.00 502.17 513.08 6.15
------------------------------------------------------------
425-514-23 645.00 541.52 552.76 5.64
------------------------------------
including 541.52 542.53 0.51
------------------------------------------------------------
425-487-11 598.81 383.72 393.00 4.54
------------------------------------------------------------
425-487-12 667.00 474.00 504.00 11.87
------------------------------------
including 480.00 480.95 0.38
------------------------------------
including 501.00 501.60 0.24
------------------------------------------------------------
425-487-13 576.00 356.50 366.50 5.76
------------------------------------------------------------
425-487-14 550.00 410.09 414.43 2.22
------------------------------------------------------------
425-487-15 576.00 410.78 415.80 2.49
------------------------------------------------------------
425-487-17 600.54 436.42 451.00 6.62
------------------------------------------------------------
425-487-18 489.00 353.90 360.75 4.01
------------------------------------
354.30 354.60 0.18
------------------------------------------------------------
435-478-02 700.81 476.55 485.21 3.05
------------------------------------
including 480.26 480.83 0.20
------------------------------------
including 483.81 484.26 0.16
------------------------------------------------------------
435-478-03 489.00 390.10 394.52 2.02
------------------------------------
including 390.40 391.90 0.69
------------------------------------------------------------
435-478-04 549.00 337.54 341.04 1.99
------------------------------------------------------------
435-478-05 615.00 383.20 386.90 2.00
------------------------------------------------------------
GD-468-01W1 1,176.00 1,057.60 1,062.00 2.01
------------------------------------------------------------
TOTAL 11,847.36
------------------------------------------------------------

Hole Length Uncut Cut Zone Vertical depth
Number (metres) Grade Grade(2) of Intersection
(g/t Au) (g/t Au) (metres)
----------------------------------------------------------------------------
400-514-03 486.00 106.15 36.91 C 700
------------------------
including 221.63 75.00
----------------------------------------------------------------------------
400-514-10 480.00 61.92 20.06 C 632
------------------------
including 264.24 75.00
----------------------------------------------------------------------------
400-514-13A 683.20 18.19 15.50 C 835
------------------------
including 86.20 63.45
----------------------------------------------------------------------------
400-514-15 732.00 17.51 10.89 C 986
------------------------
including 128.88 75.00
----------------------------------------------------------------------------
400-514-21D 669.00 10.15 9.00 C 783
------------------------
including 82.25 64.55
----------------------------------------------------------------------------
400-514-22 555.00 2.78 2.78 C 783
----------------------------------------------------------------------------
425-514-23 645.00 10.16 9.78 C 836
------------------------
including 76.10 71.86
----------------------------------------------------------------------------
425-487-11 598.81 8.30 8.30 C 730
----------------------------------------------------------------------------
425-487-12 667.00 9.97 6.94 C 831
------------------------
including 93.20 75.00
------------------------
including 198.00 75.00
----------------------------------------------------------------------------
425-487-13 576.00 3.69 3.69 C 659
----------------------------------------------------------------------------
425-487-14 550.00 10.65 10.65 C 759
----------------------------------------------------------------------------
425-487-15 576.00 4.72 4.72 C 756
----------------------------------------------------------------------------
425-487-17 600.54 5.81 5.81 C 786
----------------------------------------------------------------------------
425-487-18 489.00 410.21 8.83 C 686
----------------------------------------------------
9,240.00 75.00 C 686
----------------------------------------------------------------------------
435-478-02 700.81 15.18 11.58 C 867
------------------------
including 119.00 75.00
------------------------
including 88.40 75.00
----------------------------------------------------------------------------
435-478-03 489.00 94.78 25.73 C 727
------------------------
including 270.07 66.60
----------------------------------------------------------------------------
435-478-04 549.00 4.42 4.42 C 698
----------------------------------------------------------------------------
435-478-05 615.00 3.12 3.12 C 716
----------------------------------------------------------------------------
GD-468-01W1 1,176.00 3.18 3.18 C 1,023
----------------------------------------------------------------------------
TOTAL 11,847.36
----------------------------------------------------------------------------
(1) Included in Inferred Resource estimate published February 25, 2013.
Please see the Regulation 43-101 at the end of this release for full
analysis details.
(2) High values are cut at 75 g/t.


Additional details about the Island Gold Mine Property


The 84.4 km2 (8,444 hectare) Island Gold property is located 83 km northeast of Wawa, Ontario. Ore from the Island Gold Mine is processed at Richmont's on-site mill, an 850 tonne per day rated CIP facility. Since Island Gold began commercial production in October 2007, Richmont has produced more than 225,000 ounces of gold. Underground operations are accessed via a ramp, and the mine's infrastructure currently reaches a vertical depth of approximately 400 metres. As of December 31, 2012, the Island Gold Mine had a total of 191 employees.


About Richmont Mines Inc.


Richmont Mines has produced over 1,300,000 ounces of gold from its operations in Quebec, Ontario and Newfoundland since beginning production in 1991. The Corporation currently produces gold from the Island Gold Mine in Ontario and the Beaufor Mine in Quebec and is advancing two gold projects, the W Zone project and the Monique Gold Project. With extensive experience in gold exploration, development and mining, the Corporation is well positioned to cost-effectively build its Canadian reserve base through a combination of organic growth, strategic asset acquisitions and partnerships. Richmont routinely posts news and other important information on its website (www.richmont-mines.com).


Forward-Looking Statements


This news release contains forward-looking statements that include risks and uncertainties. When used in this news release, the words "estimate", "project", "anticipate", "expect", "intend", "believe", "hope", "may" and similar expressions, as well as "will", "shall" and other indications of future tense, are intended to identify forward-looking statements. The forward-looking statements are based on current expectations and apply only as of the date on which they were made.


The factors that could cause actual results to differ materially from those indicated in such forward-looking statements include changes in the prevailing price of gold, the Canadian-United States exchange rate, grade of ore mined and unforeseen difficulties in mining operations that could affect revenue and production costs. Other factors such as uncertainties regarding government regulations could also affect the results. Other risks may be set out in Richmont Mines' Annual Information Form, Annual Reports and periodic reports.


Cautionary note to US investors concerning resource estimates


Information in this press release is intended to comply with the requirements of the Toronto Stock Exchange and applicable Canadian securities legislation, which differ in certain respects with the rules and regulations promulgated under the United States Securities Exchange Act of 1934, as amended ("Exchange Act"), as promulgated by the SEC. The reserve and resource estimates in this press release were prepared in accordance with Regulation 43-101 adopted by the Canadian Securities Administrators. The requirements of Regulation 43-101 differ significantly from the requirements of the United States Securities and Exchange Commission (the "SEC").


U.S. Investors are urged to consider the disclosure in our annual report on Form 20-F, File No. 001-14598, as filed with the SEC under the Exchange Act, which may be obtained from us (without cost) or from the SEC's web site: http://sec.gov/edgar.shtml.


Regulation 43-101


The exploration program was conducted by qualified persons as defined by Regulation 43-101. Specifically, the program was overseen by Mr. Daniel Adam, Geo., Ph.D., Vice-President, Exploration, who is a Qualified Person as defined by Regulation 43-101, and an employee of Richmont Mines Inc. Mr. Adam verified and approved the information in this press release. The analyses were conducted at Activation Laboratories Ltd. in Geraldton, Ontario, and at the Lab Expert laboratory in Rouyn-Noranda, Quebec, by means of fire assay fusion with atomic absorption (AA) and gravimetric finish.

Visit our Facebook page

Contacts:

Investor Relations:

Jennifer Aitken

RICHMONT MINES INC.

514 397-1410 ext. 101
jaitken@richmont-mines.com


Media:

Francis Beauvais

RICHMONT MINES INC.

819 797-2465
fbeauvais@richmont-mines.com
www.richmont-mines.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Richmont Mines Inc.
Bergbau
-
-
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"