Suche
 
Folgen Sie uns auf:

Peruvian Precious Metals Corp. Files Amended Technical Report on the Callanquitas Structure, No Chan

03.10.2013  |  FSCwire

Peruvian Precious Metals Corp. Files Amended Technical Report on the Callanquitas Structure, No Change to Resource Estimate

Vancouver, British Columbia CANADA, October 03, 2013 /FSC/ - Peruvian Precious Metals Corp. (PPX - TSX Venture), (the "Company"), announces that it has filed on SEDAR an amended NI 43-101 Technical Report for the Callanquitas Structure at its Igor Project in Northern Peru (Technical Report on the Callanquitas Structure, Igor Mine Project, Northern Peru, South America, Released December 14, 2012, Amended September 27, 2013, Qualified Persons: Bruce Davis and Robert Sim).  As a result of a review by the British Columbia Securities Commission, several amendments were made to the report, including:  the identity of the expert relied upon for mineral and surface ownership and access rights was included, additional disclosure about past work programs, drill holes and assay results and previous metallurgical testing was added, reference to "potentially economic models" on page 14-11 of the original report was eliminated, and additional explanation of methodology employed to limit the influence of high grade gold assays in the block model was added.  The inferred mineral resource estimate in the original report remains unchanged in the amended report and is reproduced in the table below:

-***-

-----------------------------------------------------------------------
  Cut-Off   Tonnes  Au Eq  Au    Ag  Contained  Contained  Contained
Au Eq*(gpt)  (kt)  (gpt)* (gpt) (gpt)  Au(koz)   Ag(Moz)  Au Eq (koz)*
-----------------------------------------------------------------------
    0.5     11,291  2.39  1.47   53.8   535.0      19.5      866.9
-----------------------------------------------------------------------
    1.0      9,486  2.70  1.67   60.5   508.6      18.4      822.1
-----------------------------------------------------------------------
    1.5      7,189  3.16  1.94   71.8   448.5      16.6      730.5
-----------------------------------------------------------------------
    2.0      5,460  3.61  2.19   83.7   384.6      14.7      634.3
-----------------------------------------------------------------------
    2.5      3,992  4.11  2.45   98.2   313.9      12.6      528.1
-----------------------------------------------------------------------
    3.0      2,730  4.75  2.73  119.1   239.4      10.5      417.1
-----------------------------------------------------------------------
      *Au Eq = Au + (Ag*0.017) based on Au:Ag price ratio of 60:1

-****-

The inferred mineral resources estimate for the Callanquitas Structure, at a cut-off grade of 1.5 gpt Au Eq, is 7,189,00 tonnes grading 1.94 gpt Au and 71.8 gpt Ag (3.16 gpt Au Eq).  Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the mineral resource will be converted into mineral reserves.

As disclosed in the current report, the authors of the current report were unable to visit the Domos and Tesoros areas of the property and validate the underlying data to confirm or update the resource estimates on these areas disclosed in the February 8, 2008 technical report for the property.  As NI 43-101 requires that there be only one current technical report on the property, the February 8, 2008 report is no longer current and those estimates are no longer supported.  Therefore, the Company is retracting its disclosure of resource estimates for the Domos and Tesoros areas.

Letters of Consent from the Qualified Persons for the Callanquitas Technical Report, as amended, have also been filed on SEDAR.

The Technical information in this press release has been reviewed by Robert Sim, P. Geo., a Qualified Person, based on the definitions in NI 43-101.

On behalf of the Board of Directors
Brian J. Maher
President and Chief Executive Officer

FOR FURTHER INFORMATION, PLEASE CONTACT:
Peruvian Precious Metals Corp.
Kimberly Ann Arntson, Vice President - Corporate Development
Phone: 1-530-414-4400
Email: kimberly.ann@peruvianpmc.com
Website:  www.peruvianpmc.com


Cautionary Statement:

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.


To view this press release as a PDF file, click onto the following link:
http://www.usetdas.com/pr/PeruvianTROct32013.pdf  





Maximum News Dissemination by FSCwire. http://www.fscwire.com

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
PPX Mining Corp.
Bergbau
A2APYX
CA69354U1003
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"