RTG announces new extensions and new shallow high grade garnet skarn mineralised zone at the Mabilo Project
/NOT FOR DISTRIBUTION TO UNITED STATES NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES/
ANNOUNCEMENT TO THE TORONTO STOCK EXCHANGE AND AUSTRALIAN SECURITIES EXCHANGE
SUBIACO, Western Australia, Feb. 26, 2015 /CNW/ - The Board of RTG Mining Inc. ("RTG", "the Company") (TSX Code: RTG, ASX Code: RTG) is pleased to announce further significant high grade gold and copper intercepts extending mineralisation and a new high grade garnet skarn mineralised zone in the South Mineralized Zone at the Mabilo Project in the Philippines.
Resource drilling on the South Body designed for resource classification conversion has intersected a new zone of mineralised garnet skarn at shallow levels. This is the best intercept of garnet skarn mineralisation intersected to date. MDH-095 intercepted 25.80m at 2.32% Cu and 1.63 g/t Au from shallow downhole depths below volcanic overburden. Significant mineralisation in this part of the system has not been intersected previously and will be subject to follow up investigation.
Highlights of the ongoing drilling program include –
- MDH-095 Discovery of high grade Garnet Skarn mineralisation at shallow position and magnetite intercept.
25.80 meters at 2.32% Cu and 1.63 g/t Au from 111 meters downhole.
26.60 meters at 1.99% Cu and 1.62 g/t Au from 194 meters downhole. - MDH-090 Deep extension of magnetite skarn mineralisation at the deepest levels of the resource model.
11.70 meters at 1.48% Cu and 2.79 g/t Au from 307.30 meters downhole.
The interval reported in MDH-95 is significant in that Garnet Skarn has not previously been intercepted with significantly wide intervals and was not the primary target of the drill hole.
The discovery of high grade garnet skarn at shallow levels represents a new target for follow up drilling and modelling. Subsequent follow up drilling designed to intersect the same garnet skarn at shallow positions has been successful in delineating similar mineralised garnet skarn subject to oxidation processes (assays pending).
Deeper extension drill hole MDH-090 has successfully validated the current south western limit of the geological model. This confirms the system extends at depth and remains open, with MDH-090 being part of an ongoing campaign designed to upgrade the inferred resource classification at depth.
ABOUT MABILO
The Mabilo Project is located in Camarines Norte Province, Eastern Luzon, Philippines. It comprises one granted Exploration Permit (EP-014-2013-V) of approximately 498 ha and Exploration Permit Application EXPA-000188-V of 2,820 ha. The Project area is relatively flat and is easily accessed by 15 km of all-weather road from the highway at the nearby town of Labo.
Drilling is ongoing and currently focused on resource classification conversion (ASX release 24th November 2014) and extension identification to the South Body and North Body.
MDH-095
MDH-095 was set ~55m meters Southeast of MDH-060 and drilled on the previous section line. The drill hole was designed to confirm the strike and down-dip extension of the magnetite mineralisation (Figure 3). Garnet skarn has been identified in adjacent sections (Figure 4) exhibiting intervals of patchy chalcopyrite.
MDH-095 intercepted a 25.8m interval of retrogressed garnet skarn with abundant coarse grained chalcopyrite from 111m downhole. The drill hole continued to the targeted magnetite skarn intersecting 25.60 meters of magnetite skarn from 194m down hole. Drilling was in a shallow inclination across modelled lithology with true thickness of the garnet skarn being approximately 23m and magnetite being approximately 25m.
MDH-095 | From | To | Intercept | Au g/t | Cu % | Ag g/t | Fe % | Mineralisation |
111.00 | 136.80 | 25.80 | 1.63 | 2.32 | 4.0 | 9.70 | Garnet Skarn | |
including | 115.00 | 118.00 | 3.00 | 3.08 | 2.74 | 7.0 | 10.59 | Garnet Skarn |
including | 127.00 | 129.00 | 2.00 | 3.84 | 4.89 | 6.3 | 13.61 | Garnet Skarn |
including | 133.00 | 136.80 | 3.80 | 2.55 | 6.15 | 12.4 | 9.94 | Garnet Skarn |
and including | 136.00 | 136.80 | 0.80 | 7.47 | 9.20 | 23.6 | 17.02 | Garnet Skarn |
and | 194.00 | 219.60 | 25.60 | 1.62 | 1.99 | 15.2 | 42.81 | Magnetite Skarn |
including | 217.00 | 218.40 | 1.40 | 9.71 | 16.27 | 133.0 | 37.42 | Magnetite Skarn |
Drill core recovery was 100% over reported intervals.
Refer Figure 3; MDH-096 was drilled targeting the up-dip extension of the garnet skarn interval at the Labo Volcanic cover. MDH-96 intersected oxidised garnet skarn textures with and instances of coarse grained chalcopyrite, assays are pending. The recently terminated drill hole on section MDH-094 passed through mineralised garnet skarn with instances of magnetite at similar positions with targeted magnetite skarn intersected at depth.
MDH-090
MDH-090 is located 100 meters Southwest of MDH-060. Drilling is designed to upgrade the Inferred resource category of the current deepest extension to the Southwest of the model. MDH-090 successfully intersected brecciated magnetite skarn from 307.30m to 318.80 meters confirming the down dip extension of the system to over 175 meters in length with the interval in close agreement with the resource modelling. True thickness is approximately 10 meters.
MDH-090 | From | To | Intercept (m) | Au ppm | Cu % | Ag g/t | Fe % | Mineralisation |
307.30 | 319.00 | 11.70 | 2.79 | 1.48 | 25.2 | 36.27 | Magnetite Skarn | |
including | 313.00 | 317.00 | 4.00 | 6.10 | 1.70 | 23.8 | 45.63 | Magnetite Skarn |
Drill core recovery was better than 95% over reported intervals.
QUALIFIED PERSON AND COMPETENT PERSON STATEMENT
The information in this report that relates to Exploration Results at the Mabilo Project is based upon information prepared by or under the supervision of Robert Ayres BSc (Hons), who is a Qualified Person and a Competent Person. Mr Ayres is a member of the Australian Institute of Geoscientists and a full-time employee of Mt Labo Exploration and Development Company, a Philippine mining company, an associate company of RTG Mining Limited. Mr Ayres has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" and to qualify as a "Qualified Person" under National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101"). Mr. Ayres has verified the data disclosed in this release, including sampling, analytical and test data underlying the information contained in the release. Mr. Ayres consents to the inclusion in the report of the matters based on his information in the form and the context in which it appears.
ABOUT RTG MINING INC
RTG Mining Inc. is a mining and exploration company listed on the main board of the Toronto Stock Exchange and Australian Securities Exchange Limited. RTG is focused on developing the high grade copper/gold/magnetite Mabilo Project and advancing exploration on the highly prospective Bunawan Project, both in the Philippines, while also identifying major new projects which will allow the Company to move quickly and safely to production.
RTG has an experienced management team (previously responsible for the development of the Masbate Gold Mine in the Philippines through CGA Mining Ltd.), and has B2Gold as one of its major shareholders in the Company. B2Gold is a member of both the S&P/TSX Global Gold and Global Mining Indices.
CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS
This announcement includes certain "forward-looking statements" within the meaning of Canadian securities legislation. Accuracy of mineral resource and mineral reserve estimates and related assumptions and inherent operating risks, are forward-looking statements. Forward-looking statements involve various risks and uncertainties and are based on certain factors and assumptions. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from RTG's expectations include uncertainties related to fluctuations in gold and other commodity prices and currency exchange rates; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs, recovery rates, production estimates and estimated economic return; the need for cooperation of government agencies in the development of RTG's mineral projects; the need to obtain additional financing to develop RTG's mineral projects; the possibility of delay in development programs or in construction projects and uncertainty of meeting anticipated program milestones for RTG's mineral projects and other risks and uncertainties disclosed under the heading "Risk Factors" in RTG's Annual Information Form for the year ended 31 December 2013 filed with the Canadian securities regulatory authorities on the SEDAR website at sedar.com.
Appendix 1: Location of Reported Drill Holes
HOLE ID | Location | GPS | Orientation True Nth | Depth | ||||
Prospect | East | North | RL | Dip | Azi | E.O.H (m) | ||
MDH-90 | South B | Resource | 476079 | 1559581 | 127 | -60 | 50 | 344.80 |
MDH-91** | South B | Resource | 476050 | 1559632 | 118 | -60 | 50 | 305.05 |
MDH-92* | South A | Resource | 476083 | 1559934 | 109 | -50 | 50 | 81.60 |
MDH-93* | South B | Resource | 475992 | 1559713 | 119 | -60 | 50 | 350.50 |
MDH-94* | South B | Resource | 476136 | 1559577 | 122 | -60 | 50 | 295.00 |
MDH-95 | South B | Resource | 476167 | 1559603 | 119 | -50 | 50 | 251.20 |
MDH-96* | South B | Resource | 476225 | 1559660 | 131 | -62 | 50 | 209.10 |
MDH-97 | South B | Resource | 476042 | 1559664 | 117 | -60 | 50 | in progress |
MDH-98 | South B | Resource | 475952 | 1559748 | 126 | -60 | 50 | in progress |
**MDH-91 intersected a 9.2 meter magnetite skarn from 278.20m, however core recovery through the mineralised interval was less than 15% due to cavities within the marble country rock.
*Assay Pending.
All co-ordinates in UTM-WGS84 (51 N). All collars have been surveyed using handheld GPS and will be subject to professional survey pickup at a later date using DGPS system.
Appendix 1: JORC Code 2012 Edition Table 1
Section 1 Sampling Techniques and Data
Criteria | JORC Code explanation | Commentary | |
Sampling techniques |
|
| |
Drilling techniques |
|
| |
Drill sample recovery |
|
| |
Logging |
|
| |
Sub-sampling techniques and sample preparation |
|
| |
Quality of assay data and laboratory tests |
|
| |
Verification of sampling and assaying |
|
| |
Location of data points |
|
| |
Data spacing and distribution |
|
| |
Orientation of data in relation to geological structure |
|
| |
Sample security |
|
| |
Audits or reviews |
|
| |
Section 2 Reporting of Exploration Results
Criteria | JORC Code explanation | Commentary |
Mineral tenement and land tenure status |
|
|
Exploration done by other parties |
|
|
Geology |
|
|
Drill hole Information |
|
|
Data aggregation methods |
|
|
Relationship between mineralisation widths and intercept lengths |
|
|
Diagrams |
|
|
Balanced reporting |
|
|
Other substantive exploration data |
|
|
Further work |
|
|
SOURCE RTG Mining Inc.
Contact
ENQUIRIES: Australian Contact, President & CEO - Justine Magee, Tel: +61 8 6489 2900, Fax: +61 8 6489 2920, Email: jmagee@rtgmining.com