Elevation Gold Announces Filing of Technical Report on the Mineral Resource, Mineral Reserve and Mine Plan for the Moss Mine, Arizona
VANCOUVER, Nov. 2, 2021 - Elevation Gold Mining Corp. (TSXV: ELVT) (OTCQX: NHVCF) (the "Company" or "Elevation Gold") a U.S.-focused gold producer with district-scale exploration projects in the Walker Lane Trend, is pleased to announce that it has filed the updated Mineral Reserve, Mineral Resource estimates and Technical Report for its Moss Mine, Arizona, (the "Technical Report") in accordance with Canadian Securities Administrators' National Instrument 43-101. The report may be found on the Company website and under the Company's profile at www.sedar.com.
The independent report, dated October 8, 2021 (effective date of July 1, 2021), titled "Technical Report on the Mineral Resource, Mineral Reserve, and Mine Plan for the Moss Mine" was completed by Independent Mining Consultants, Inc., Forte Dynamics, Inc. and Great Basin Environmental Services, LLC, and provides detail to the disclosure in the Company's news release issued on October 21, 2021. Qualified persons for the Technical Report include Jacob W. Richey, P.E., Robert G. Cuffney, CPG, John M. Young, Adam House, MMSA and Nick Gow, MMSA.
About Elevation Gold Mining
Elevation Gold Mining offers investors a rare combination of cash flow, production, top-tier management, and exceptional exploration potential within two projects on the Walker Lane Gold Trend of western Nevada and Arizona. Management is executing a clear strategy that expands production and resources at the Moss Mine in Arizona while aggressively exploring the Hercules Project in Nevada.
ON BEHALF OF THE BOARD OF Elevation Gold Mining Corp.
"Michael G. Allen"
President
Cautionary Statement on Forward-Looking Information
Certain of the statements made and information contained herein is "forward-looking information" within the meaning of applicable Canadian securities laws. All statements other than statements of historical facts included in this document constitute forward-looking information, including but not limited to statements regarding the Company's plans, prospects and business strategies; the Company's guidance on the timing and amount of future production and its expectations regarding the results of operations; expected costs; permitting requirements and timelines; timing and possible outcome of Mineral Resource and Mineral Reserve estimations, life of mine estimates, and mine plans; anticipated exploration and development activities at the Company's projects; net present value; design parameters; economic potential; processing mineralized material; the potential of robust economic potential at the Moss Mine Project. Words such as "believe", "expect", "anticipate", "contemplate", "target", "plan", "goal", "aim", "intend", "continue", "budget", "estimate", "may", "will", "can", "could", "should", "schedule" and similar expressions identify forward-looking statements.
Forward-looking information is necessarily based upon various estimates and assumptions including, without limitation, the expectations and beliefs of management, including that the Company can access financing, appropriate equipment and sufficient labour; assumed and future price of gold, silver and other metals; anticipated costs; ability to achieve goals; and assumptions related to the factors set forth below. While these factors and assumptions are considered reasonable by the Company as at the date of this document in light of management's experience and perception of current conditions and expected developments, these statements are inherently subject to significant business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements and undue reliance should not be placed on such statements and information. Such factors include, but are not limited to: risks inherent in mining, including, but not limited to risks to the environment, industrial accidents, catastrophic equipment failures, unusual or unexpected geological formations or unstable ground conditions, and natural phenomena such as earthquakes, flooding or unusually severe weather; uninsurable risks; global financial conditions and inflation; changes in the Company's share price, and volatility in the equity markets in general; volatility and fluctuations in metal and commodity prices; the threat associated with outbreaks of viruses and infectious diseases, including the COVID-19 virus; delays or the inability to obtain, retain or comply with permits; risks related to negative publicity with respect to the Company or the mining industry in general; health and safety risks; exploration, development or mining results not being consistent with the Company's expectations; unavailable or inaccessible infrastructure and risks related to ageing infrastructure; actual ore mined and/or metal recoveries varying from Mineral Resource and Mineral Reserve estimates, estimates of grade, tonnage, dilution, mine plans and metallurgical and other characteristics; risks associated with the estimation of Mineral Resources and Mineral Reserves and the geology, grade and continuity of mineral deposits, including, but not limited to, models relating thereto; ore processing efficiency; information technology and cybersecurity risks; potential for the allegation of fraud and corruption involving the Company, its customers, suppliers or employees, or the allegation of improper or discriminatory employment practices; regulatory investigations, enforcement, sanctions and/or related or other litigation; estimates of future production and operations; estimates of operating cost estimates; the potential for and effects of labour disputes or other unanticipated difficulties with or shortages of labour or interruptions in production; risks related to the environmental regulation and environmental impact of the Company's operations and products and management thereof; exchange rate fluctuations; climate change; risks relating to attracting and retaining of highly skilled employees; compliance with environmental, health and safety laws; counterparty and credit risks and customer concentration; litigation; changes in laws, regulations or policies including, but not limited to, those related to mining regimes, permitting and approvals, environmental and tailings management, and labour; internal controls; challenges or defects in title; funding requirements and availability of financing; dilution; risks relating to dividends; risks associated with acquisitions and related integration efforts, including the ability to achieve anticipated benefits, unanticipated difficulties or expenditures relating to integration and diversion of management time on integration; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs, production estimates and estimated economic return; uncertainty of meeting anticipated program milestones; and other risks and uncertainties including but not limited to those described the Company's public disclosure documents which are available on SEDAR at www.sedar.com under the Company's profile. All of the forward-looking statements made in this document are qualified by these cautionary statements. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated, forecast or intended and readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking information. Accordingly, there can be no assurance that forward-looking information will prove to be accurate and forward-looking information is not a guarantee of future performance. Readers are advised not to place undue reliance on forward-looking information. The forward-looking information contained herein speaks only as of the date of this document. The Company disclaims any intention or obligation to update or revise forward-looking information or to explain any material difference between such and subsequent actual events, except as required by applicable law.
View original content to download multimedia:https://www.prnewswire.com/news-releases/elevation-gold-announces-filing-of-technical-report-on-the-mineral-resource-mineral-reserve-and-mine-plan-for-the-moss-mine-arizona-301413864.html
SOURCE Elevation Gold Mining Corp.
Contact
CORPORATE INQUIRIES: Michael G. Allen, President, Company Website: www.elevationgold.com, +1 (855) 633-8798 Toll Free, +1 (604) 601-3656 Office, Email: mike@elvtgold.com