Suche
 
Folgen Sie uns auf:

Nevada Sunrise Begins Geophysical Survey Over New Lithium Discovery at the Gemini Lithium Project, Nevada

12.05.2022  |  CNW
VANCOUVER, May 12, 2022 - Nevada Sunrise Gold Corp. ("Nevada Sunrise", or the "Company") (TSXV: NEV) (OTC: NVSGF) is pleased to announce that a geophysical survey has commenced at its 100%-owned Gemini Lithium Project ("Gemini"), located in the Lida Valley basin in Esmeralda County, Nevada. The time-domain electromagnetic ("TDEM") survey is planned to expand the scope of geophysical surveys carried out by the Company in 2016. Conductive zones detected in the 2016 surveys were targeted in the Company's drilling program in March and April 2022, which intersected the following mineralized zones (see Nevada Sunrise news release dated April 28, 2022):

  • Borehole GEM22-01: weighted-average of 1,203.41 parts per million ("ppm") lithium over 580 feet (176.83 metres) from 320 to 900 feet (97.56 to 274.39 metres), including 1,578.19 ppm lithium over 300 feet (91.46 metres) from 480 to 780 feet (146.34 to 237.8 metres);
  • Borehole GEM22-02: weighted-average of 775.9 ppm lithium over 130 feet (39.63 metres) from 390 to 520 feet (118.90 to 158.54 metres), including 1,133.1 ppm lithium over 40 feet (12.20 metres) from 480 to 520 feet (146.34 to 158.54 metres). The analytical results for an additional 131 samples from GEM22-02 are still pending.
2022 Geophysical Program

The 2022 surveys are designed to outline the possible lateral extent of the conductive, lithium-bearing clay layers within a historical gravity low that were intersected in drillholes GEM22-01 and GEM22-02. A total of 13.0 line kilometres are planned in three new survey lines as shown in Figure 1.

The TDEM moving loop survey will employ 400 metre by 400 metre loops to collect data along new survey lines parallel to the 2016 survey lines, which had detected a highly-conductive layer (see Figure 2 below). At present, the northern and western limits of the conductive clay layer at Gemini are not well-defined and the 2022 survey results are anticipated to add to the Company's geological knowledge of the conductive zones. Results from the TDEM survey are expected during May 2022 and based on those results, Nevada Sunrise plans to submit an amended drilling plan to the Bureau of Land Management ("BLM") for the permitting of new drill targets at Gemini.

About Gemini

Gemini consists of 407 unpatented placer and lode claims located in the western Lida Valley, Esmeralda County, approximately 6 miles (10 kilometres) east of the town of Lida, Nevada. Nevada Sunrise expanded the size of the Project by staking 80 additional unpatented placer claims and 288 new unpatented lode claims in the spring of 2022. Gemini is situated adjacent to the Gold Point Solar Energy Zone, a BLM land reserve set aside for solar and wind power generation projects until 2033. Drill pads and access roads are in place at Gemini with an active drilling permit.

The Lida Valley is a flat, arid basin with a similar geological setting to the better-known Clayton Valley basin where Albermarle Corporation operates the Silver Peak lithium brine mine, which has operated continuously since 1966. Exploration at Gemini is complemented by the Company's 80.09 acre/feet/year water right, a pre-requisite for the exploration and development of lithium brine projects in Nevada. Under the laws of Nevada, water cannot be pumped from a subterranean source without a valid water permit.

Nevada Sunrise drilled two reverse circulation ("RC") boreholes for a total of 2,020 feet (615.85 metres) in its maiden drilling program at Gemini in March and April 2022. The initial results represent a new discovery of lithium-bearing sediments in the western Lida Valley, which has not been historically drill tested for lithium mineralization. The initial analytical results from boreholes GEM22-01 and GEM22-02 suggest that the lithium-bearing clay layers at Gemini may be widespread. Additional drilling is planned following receipt of an amendment to the current BLM drilling permit, which will be required to cover the Company's newly-expanded land position.

For further information on Gemini, including location maps and photos click here

Sampling and Analytical QA/QC and Statement of Qualified Person

The results of geochemical analysis on sediment samples described in this news release were shipped in March and April 2022 to American Assay Laboratories and ALS Group USA ("ALS") and were analyzed utilizing a multi-element ICP-MS method. Specifically, the analytical method involves aqua regia digestion of the sample followed by the inductively coupled plasma (ICP) technique to ionize the sample, and spectrometry to determine elemental concentrations. Duplicates, field blanks, and certified reference standards were inserted at regular intervals in the sample stream to ensure accuracy of the analytical method.

The scientific and technical information contained in this news release has been reviewed and approved by Robert M. Allender, Jr., CPG, RG, SME and a Qualified Person for Nevada Sunrise as defined in National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

About Nevada Sunrise

Nevada Sunrise is a junior mineral exploration company with a strong technical team based in Vancouver, BC, Canada, that holds interests in gold, copper, cobalt and lithium exploration projects located in the State of Nevada, USA.

The Company's key gold asset is a 20.01% interest at the Kinsley Mountain Gold Project ("Kinsley Mountain") near Wendover, NV. Kinsley Mountain is a joint venture with Copaur Minerals Inc. ("Copaur", TSXV:CPAU), following the completion of a plan of arrangement between Copaur and the Company's former joint venture partner, New Placer Dome Gold Corp. Kinsley Mountain is a Carlin-style gold project hosting a National Instrument 43-101 compliant gold resource consisting of 418,000 indicated ounces of gold grading 2.63 g/t Au (4.95 million tonnes), and 117,000 inferred ounces of gold averaging 1.51 g/t Au (2.44 million tonnes), at cut-off grades ranging from 0.2 to 2.0 g/t Au 1.

1 Technical Report on the Kinsley Project, Elko County, Nevada, U.S.A., dated June 21, 2021 with an effective date of May 5, 2021 and prepared by Michael M. Gustin, Ph.D., and Gary L. Simmons, MMSA and filed under New Placer Dome Gold Corp.'s Issuer Profile on SEDAR (www.sedar.com).

Nevada Sunrise has right to earn a 100% interest in the Coronado VMS Project, located approximately 48 kilometers (30 miles) southeast of Winnemucca, NV. The Company owns a 15% interest in the historic Lovelock Cobalt Mine and the Treasure Box copper properties, each located approximately 150 kilometers (100 miles) east of Reno, NV, with Global Energy Metals Corp. (TSXV: GEMC) holding an 85% participating interest.

Nevada Sunrise owns 100% interests in the Gemini and Jackson Wash lithium projects, both of which are located in Esmeralda County, NV. The Company owns Nevada water right Permit 86863, located in the Lida Valley basin, near Lida, NV.

FORWARD LOOKING STATEMENTS

This release may contain forward-looking statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur and include disclosure of anticipated exploration activities. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date such statements were made. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise.

Such factors include, among others, risks related to the Company's 2022 exploration plans at the Gemini Lithium Project; reliance on technical information provided by third parties on any of our exploration properties; changes in project parameters as plans continue to be refined; current economic conditions; future prices of commodities; possible variations in grade or recovery rates; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; labor disputes and other risks of the mining industry; delays due to pandemic; delays in obtaining governmental approvals, financing or in the completion of exploration, as well as those factors discussed in the section entitled "Risk Factors" in the Company's Management Discussion and Analysis for the Three Months Ended December 31, 2021, which is available under Company's SEDAR profile at www.sedar.com.

Although Nevada Sunrise has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Nevada Sunrise disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise. Accordingly, readers should not place undue reliance on forward-looking information.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. The securities of Nevada Sunrise Gold Corp. have not been registered under the United States Securities Act of 1933, as amended, and may not be offered or sold within the United States or to the account or benefit of any U.S. person.

SOURCE Nevada Sunrise Gold Corp.



Contact
Warren Stanyer, President and Chief Executive Officer, Telephone: (604) 428-8028, email: warrenstanyer@nevadasunrise.ca; Jason Powell, Corporate Communications, Telephone: (604) 779-6497, email: nevadasunrisegold@outlook.com

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Nevada Sunrise Metals Corp.
Bergbau
A3DUP8
CA6414921032
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"