Suche
 
Folgen Sie uns auf:

Eastplats Reports Production Results for the Quarter Ended March 31, 2012

19.04.2012  |  Marketwired

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 04/19/12 -- Eastern Platinum Limited (TSX: ALR)(AIM: ELR)(JSE: EPS)("Eastplats") reports operating results from the Crocodile River Mine ("CRM") for the quarter ended March 31, 2012 ("Q1 2012").



Production statistics for the current quarter and historical quarters are
as follows:

----------------------------------------------------------------------------
Increase
Quarter ended (decrease)
----------------------------------------------------------------------------
Q1 2012 Q1 2012
Production Mar 31, Dec 31, Sep 30, Jun 30, Mar 31, vs. vs.
statistics 2012 2011 2011 2011 2011 Q4 2011 Q1 2011
----------------------------------------------------------------------------
Ounces produced 24,474 19,854 26,955 20,528 25,387 4,620 (913)
----------------------------------------------------------------------------
Run-of-mine tonnes
hoisted 247,538 200,919 265,889 203,166 247,369 46,619 169
----------------------------------------------------------------------------
Run-of-mine tonnes
processed 235,354 194,532 261,280 201,986 245,500 40,822 (10,146)
----------------------------------------------------------------------------
Development
(meters) 3,117 2,929 3,976 3,562 4,219 188 (1,102)
----------------------------------------------------------------------------
On-reef
development
(meters) 1,704 1,591 2,248 2,090 2,434 113 (730)
----------------------------------------------------------------------------
Stoping units
(square meters) 39,857 31,767 40,594 31,828 44,674 8,090 (4,817)
----------------------------------------------------------------------------
Head grade
(grams/tonne) 4.07 4.05 4.08 3.93 3.93 0.02 0.14
----------------------------------------------------------------------------
Concentrator
recovery from ROM
ore(i) 77% 76% 78% 76% 79% 1% (2%)
----------------------------------------------------------------------------
Chrome dispatched
(tonnes) 74,920 62,791 77,531 64,913 62,498 12,129 12,422
----------------------------------------------------------------------------

(i) Concentrator recovery has been rounded to the nearest percentage point.


First quarter mining and production at the Crocodile River Mine ("CRM") improved compared to the fourth quarter of 2011, which was negatively impacted by strike action by employees of CRM's main mining contractor, JIC Mining Services ("JIC"), in October, and by a Section 54 shut-down of operations following the fatality at CRM in November. Both incidents resulted in stoppages of mining operations.


The JIC strike has had a lingering effect on Q1 2012 production. Although PGM ounces produced in Q1 2012 are similar to PGM ounces produced in Q1 2011, the production at the Maroelabult Section remains below the Company's budgeted levels. The Company and JIC are taking measures to rectify this and further improvements are expected in the second quarter of 2012.


The qualified person having reviewed the operating results presented in this press release is Mr. Brian Montpellier, P.Eng.


Eastplats expects to release its full first quarter results on Monday, May 14, 2012.


Total shares issued and outstanding: 928,187,807


Cautionary Statement on Forward-Looking Information


Certain statements included herein constitute "forward-looking statements" within the meaning of applicable Canadian securities legislation. These forward-looking statements are based on certain assumptions by the Company and therefore, readers are cautioned that forward-looking statements are not a guarantee of future performance. There can be no assurance that such statements will prove to be accurate and actual results could differ materially from those expressed or implied in such forward-looking statements due to factors such as general economic and market conditions, changes in government legislation, controls, regulations and political developments.


The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except to the extent required by applicable laws.


No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

Contacts:

Eastern Platinum Limited

Investor Relations

1-(604)-685-6851

1-(604)-685-6493 (FAX)
info@eastplats.com
www.eastplats.com


NOMAD:

Canaccord Genuity Limited, London

Rob Collins

+44 20 7050 6500


JSE SPONSOR:

PSG Capital (Pty) Limited

Johan Fourie

+27 21 887 9602
johanf@psgcapital.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Eastern Platinum Ltd.
Bergbau
A118RL
CA2768555096
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"