Suche
 
Folgen Sie uns auf:

Orvana Announces Operations Update at El Valle-Boinas/Carles Gold/Copper Mine, Northern Spain

23.05.2012  |  Marketwired

TORONTO, ONTARIO -- (Marketwire) -- 05/23/12 -- Orvana Minerals Corp. (TSX: ORV) (the "Company") is pleased to provide, through its wholly-owned subsidiary Kinbauri Espana S.L.U. ("Kinbauri"), an update of operations for its El Valle-Boinas/Carles ("EVBC") gold-copper mine in northern Spain.


April production was over 3,700 ounces of gold, 400,000 pounds of copper, and 11,000 ounces of silver (see table below). Estimated direct cash operating costs, including royalties and net of by-product revenues, was approximately $700/ounce of gold.



EVBC Mill Production
--------------------------------------------
--------------------------------------------

Apr-12
----------
Throughput (tonnes) 47,473
--------------------------------------------
Head Grade Gold, g/t 2.62
Copper, % 0.47
Silver, g/t 9.4
--------------------------------------------
Recovery, % Gold 93.7
Copper 83.7
Silver 78.1
--------------------------------------------
Production (concentrate)
Gold, oz 2,547
Copper, '000 lbs 414
Silver, oz 10,001
--------------------------------------------
Production (bullion)
Gold, oz 1,201
Silver, oz 1,213
--------------------------------------------
--------------------------------------------
TOTAL PRODUCTION
Gold, oz 3,748
Copper, '000 lbs 414
Silver, oz 11,214
--------------------------------------------
--------------------------------------------


"We have overcome many of the underground logistical issues," said Agne Ahlenius, Chief Operating Officer of the Company and General Manager of Kinbauri. "Four stopes at San Martin are ready for mining, the two roadheaders are performing well on the Charnela and A107 structures, and mining is going very well at Carles. We expect significant improvement of gold head grades for May."


The installation of the shaft head frame and key underground infrastructure is nearly complete and commissioning is now planned for June. During the month, skarn ore was pre-crushed at the backfill facility and a throughput of over 2,000 tonnes per day was achieved. It is planned that this throughput level will be maintained once the shaft and underground crusher are operational.


Qualified Person


The technical information herein was prepared by Bill Williams, Ph.D., CPG, President and Chief Executive Officer of Orvana, who is a qualified person for the purposes of NI 43-101.


About Orvana


Orvana is a multi-mine gold and copper producer. Orvana's primary asset is the El Valle/Boinas-Carles gold-copper Mine in northern Spain. Orvana also operates the Don Mario Mine in Bolivia, where the mining and processing of the copper-gold-silver Upper Mineralized Zone deposit reached commercial production in January 2012. Orvana recently filed an NI 43-101-compliant feasibility study and received a mine permit on its Copperwood copper project in Michigan, USA. Additional information is available at Orvana's website (www.orvana.com).


Forward Looking Disclaimer


Certain statements in this press release constitute forward-looking statements or forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, potentials, future events or performance (often, but not always, using words or phrases such as "believes", "expects" "plans", "estimates" or "intends" or stating that certain actions, events or results "may", "could", "would", "might", "will" or "are projected to" be taken or achieved) are not statements of historical fact, but are forward-looking statements.


Forward-looking statements relate to, among other things, all aspects of the development of the Upper Mineralized Zone ("UMZ") deposit at the Don Mario Mine in Bolivia, the El Valle-Boinas/Carles ("EVBC") Mines in Spain and the Copperwood project in Michigan and their potential operations and production; the outcome and timing of decisions with respect to whether and how to proceed with such development and production; the timing and outcome of any such development and production; estimates of future capital expenditures; mineral resource estimates; estimates of permitting time lines; statements and information regarding future feasibility studies and their results; production forecasts; future transactions; future metal prices; the ability to achieve additional growth and geographic diversification; future production costs; future financial performance, including the ability to increase cash flow and profits; future financing requirements; and mine development plans.


Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by Orvana as of the date of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The estimates and assumptions of Orvana contained or incorporated by reference in this news release, which may prove to be incorrect, include, but are not limited to, the various assumptions set forth herein as well as: there being no significant disruptions affecting operations, whether due to labour disruptions, supply disruptions, power disruptions, damage to equipment or otherwise; permitting, development, operations, expansion and acquisitions at the UMZ deposit, EVBC Mines and the Copperwood project being consistent with the Company's current expectations; political developments in any jurisdiction in which the Company operates being consistent with its current expectations; certain price assumptions for gold, copper and silver; prices for key supplies being approximately consistent with current levels; production and cost of sales forecasts meeting expectations; the accuracy of the Company's current mineral reserve and mineral resource estimates; and labour and materials costs increasing on a basis consistent with Orvana's current expectations.


A variety of inherent risks, uncertainties and factors, many of which are beyond the Company's control, affect the operations, performance and results of the Company and its business, and could cause actual events or results to differ materially from estimated or anticipated events or results expressed or implied by forward looking statements.


Some of these risks, uncertainties and factors include fluctuations in the price of gold, silver and copper; the need to recalculate estimates of resources based on actual production experience; the failure to achieve production estimates; variations in the grade of ore mined; variations in the cost of operations; the availability of qualified personnel; the Company's ability to obtain and maintain all necessary regulatory approvals and licenses; the Company's ability to use cyanide in its mining operations; risks generally associated with mineral exploration and development, including the Company's ability to maintain commercial levels of production at the UMZ deposit and the EVBC Mines to and further develop the Copperwood project; the Company's ability to acquire and develop mineral properties and to successfully integrate such acquisitions; the Company's ability to obtain financing when required on terms that are acceptable to the Company; challenges to the Company's interests in its property and mineral rights; and current, pending and proposed legislative or regulatory developments or changes in political, social or economic conditions in the countries in which the Company operates; general economic conditions worldwide.


Forward-looking statements are based on management's current plans, estimates, projections, beliefs and opinions and, except as required by law, the Company does not undertake any obligation to update forward-looking statements should assumptions related to these plans, estimates, projections, beliefs and opinions change. Readers are cautioned not to put undue reliance on forward-looking statements.

Contacts:

Orvana Minerals Corp.

Natalie Frame

Investor Relations

(289) 200-7640


Orvana Minerals Corp.

Bill Williams

President and Chief Executive Officer

(416) 369-1629
ask_us@orvana.com
www.orvana.com


Kinbauri Espana S.L.U.

Agne Ahlenius

Director General

(416) 369-1629


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Orvana Minerals Corp.
Bergbau
889301
CA68759M1014
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"