Suche
 
Folgen Sie uns auf:

Kesselrun Resources Provides Bluffpoint Update

30.05.2017  |  Newsfile
Thunder Bay, May 30, 2017 - Kesselrun Resources Ltd. (TSXV: KES), (OTC Pink: KSSRF) ("Kesselrun") is pleased to provide the following update on its 100% owned Bluffpoint Gold Project:

Structural and alteration mapping is ongoing on the Bluffpoint Gold Project. Significant grab sample results are summarized below.

Table 1: Summary of Significant Grab Sample Results — Bluffpoint Project (1)

Sample ID Au (g/t) Easting (mE) Northing (mN)
329016 55.31 471644 5449055
329113 26.40 471738 5449089
329706 23.88 472313 5449274
329341 9.91 471819 5448948
329488 9.15 471500 5449352
329707 3.24 472290 5449354
329054 3.51 470353 5446261
329473 2.54 472305 5449352
329115 1.97 471730 5449100
329017 1.95 471655 5449058
329704 1.94 472613 5449699
329451 1.56 475439 5450561
329408 1.51 472212 5449413


(1) Grab samples are selectively taken and random in size and may not be representative of mineralization characteristics

Michael Thompson, P.Geo., President and CEO, commented, "Bluffpoint continues to impress with the number of new showings being discovered. These encouraging results, along with the structural and alteration mapping, has enabled us to refine our mineralization model. Targeting is ongoing utilizing these results for eventual drill testing in the future".

Kesselrun's Bluffpoint Gold Project is located approximately 50 km northeast of, and on the same structural trend as, New Gold's Rainy River mine which is currently under construction. First production at Rainy River is estimated for September 2017 at a rate of 325,000 ounces per year (See New Gold's January 30, 2017 news release). Kesselrun's management believes Bluffpoint has all the ingredients to host a major gold deposit and continues to move the project forward.

Michael Thompson, P. Geo., President and CEO of Kesselrun, is the Qualified Person responsible for the project as defined by National Instrument 43-101 and has approved the technical information in this news release.

QA/QC

Kesselrun has implemented a quality control program for the trench sampling and planned drill program to ensure best practice in sampling and analysis. The planning, execution and monitoring of Kesselrun's quality control programs are under the supervision of Michael Thompson, P. Geo. Kesselrun maintains strict quality assurance/quality control protocols including the systematic insertion of certified standard reference and blank materials into each sample batch. Analyses in this release were performed by Accurassay Laboratories Ltd. of Thunder Bay, Ontario with ISO 17025 accreditation. Samples are transported in security sealed bags to Accurassay and all samples were analyzed using industry-standard techniques. Gold was analyzed by a standard 30 gram fire assay with an AA and/or gravimetric finish.

About Kesselrun Resources Ltd.

Kesselrun Resources is a Thunder Bay, Ontario-based mineral exploration company focused on growth through property acquisitions and discoveries. Kesselrun's management team possesses strong geological and exploration expertise with particular experience in Northwest Ontario. For more information about Kesselrun Resources, please visit www.kesselrunresources.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

For additional information please contact:

Kesselrun Resources Ltd.
Michael Thompson, P. Geo., President & CEO
807.285.3323
michaelt@kesselrunresources.com

Corporate Communications
1.866.416.7941
information@kesselrunresources.com

Forward Looking Statements — Certain information set forth in this news release may contain forward-looking statements that involve substantial known and unknown risks and uncertainties. These forward-looking statements are subject to numerous risks and uncertainties, certain of which are beyond the control of Kesselrun, including, but not limited to the impact of general economic conditions, industry conditions, volatility of commodity prices, dependence upon regulatory approvals, the execution of definitive documentation, the availability of financing and exploration risk. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements.

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Kesselrun Resources Ltd.
Bergbau
A1J1N6
CA4925371052
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"